Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

2results about How to "Optimized structural form" patented technology

Stacking equipment and battery swap station

PendingCN122354425AImprove applicabilitySatisfy the needs of battery replacementElectrical batteryControl engineering
This application discloses a palletizing device and a battery swapping station. The palletizing device includes a support frame and a transfer arm mounted on the support frame. The transfer arm is telescopic relative to the support frame to transfer battery packs. It also includes a drive unit and a support tray. The output shaft of the drive unit is connected to the support tray. The support tray is mounted on the support frame and spaced horizontally from the transfer arm. Driven by the drive unit, the support tray can move vertically and has a support position above the upper surface of the transfer arm and an initial position below the upper surface of the transfer arm, allowing the battery pack to be transferred onto the support tray or the transfer arm. The lifting device of this application increases the conveying stroke of the transfer arm, making it suitable for battery packs with different conveying stroke requirements, thus meeting the battery swapping needs of battery swapping vehicles with different battery pack sizes.
Owner:AULTON NEW ENERGY AUTOMOBILE TECHNOLOGY CO LTD

Composite anchoring structure and anchoring method for wind power mixed tower

The invention discloses a composite anchoring structure and an anchoring method of a wind power mixed tower, the composite anchoring structure comprises a mixed tower body, the lower part of the mixed tower body is a concrete tower tube section, and the composite anchoring structure further comprises a concrete foundation buried under the earth surface and used for bearing the mixed tower body; the external pre-stressed anchoring assembly comprises a pre-stressed cable and an anchor base, the upper end of the pre-stressed cable is connected with the mixed tower body, the lower end of the pre-stressed cable extends to the outer side of the concrete foundation and is anchored to the upper portion of the outer side wall of the concrete foundation through the anchor base, and an anchoring point is higher than the ground surface; the built-in pre-stressed anchor bolt assembly comprises a pre-stressed anchor bolt, an upper anchor plate and a lower anchor plate, the upper anchor plate is pre-embedded in the top of the concrete foundation and fixedly connected with the bottom of the concrete tower drum section, the lower anchor plate is pre-embedded in the lower portion of the interior of the concrete foundation, the pre-stressed anchor bolt penetrates through the concrete foundation, and the two ends of the pre-stressed anchor bolt are fixedly connected with the upper anchor plate and the lower anchor plate correspondingly; prestress is applied to the concrete foundation, and the concrete tower drum section is anchored on the concrete foundation. The problems that a traditional anchoring structure is inconvenient to construct, difficult to overhaul and prone to cracking and water seepage are solved.
Owner:HUANENG ANDA CITY CLEAN ENERGY CO LTD +1