A technology of concrete shear wall and connecting device, which is applied in the construction type, construction, construction material processing and other directions, can solve the problems of poor seismic performance and low safety, and achieves improved seismic performance, improved safety, and improved fixing effect. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Such as Figure 1-6As shown, a connection device between prefabricated stairs and cast-in-situ concrete shear wall limbs in this embodiment includes a shear wall body 1, a staircase body 2, an installation base 3 and angle steel 11, and the installation base 3 includes a plurality of The stair body (2) is distributed at intervals in the length direction, and one side of the stair body (2) is rotatably connected with a rotating plate 4 . The surface of the installation base 3 and the shear wall 1 is provided with a fixing mechanism 5 used in conjunction with each other, the surface of the installation base 3 and the rotating plate 4 is provided with a positioning mechanism 6 used in cooperation, and the other side of the rotating plate 4 is installed with a support Slant bar 7, support platform 8 is installed on the other end of support slant bar 7, and the top of support platform 8 is bolted with positioning column 9, and the bottom of stair body 2 is provided with bott...
Embodiment 2
[0037] Such as figure 2 and image 3 As shown, a connection device between prefabricated stairs and cast-in-place concrete shear wall limbs in this embodiment, its main structure is basically the same as in Embodiment 1, the main difference is that the fixing mechanism 5 includes fixing bolts 51, fixing holes 52 and the fixing groove 53, the fixing hole 52 runs through the surface of the installation base 3, the fixing groove 53 is set on the surface of the shear wall 1, and the fixing bolt 51 passes through the fixing hole 52 and is threadedly connected with the inner wall of the fixing groove 53, through The setting of fixing bolt 51, fixing hole 52 and fixing groove 53, fixing bolt 51 passes through fixing hole 52 and enters the inside of fixing groove 53, just can fix installation base 3 on the surface of shear wall body 1, realize to install The base 3 has the effect of being fixed, and can also be disassembled simultaneously.
[0038] The positioning mechanism 6 inclu...