Anti-debonding forming method of concrete filled steel tube arch ribs
A technology of steel pipe concrete and forming method, which is applied in the direction of arch bridge, arch structure, dome structure, etc., can solve the problems of limited volume expansion of concrete, large steel pipe, unavoidable debonding of concrete and steel pipe, etc., to achieve easy promotion, The effect of less material and increased construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] In this embodiment, a geotextile bag is used as the dilator. Take the forming of an arch rib in a concrete-filled steel tube arch bridge as an example. The outer diameter of the steel pipe of the arch rib is 1200mm, and the wall thickness is 20mm. The concrete adopts micro-expansion self-compacting concrete, the strength grade is C80, the initial setting time is 6 hours, and the final setting time is 10 hours. In order to improve the anti-debonding ability between the formed steel pipe and the internal concrete, the following construction scheme is adopted:
[0027] Before erecting the arch-rib steel pipe section, geotechnical cloth bags 10 are arranged in five steel pipe sections corresponding to the arch height 1 / 4, 1 / 2, 3 / 4, and the vault, wherein the vault is as figure 1 shown. Positioning rope 8 adopts fine steel wire rope, and two ends are tied on the upper side and the lower side inner wall of steel pipe 1, are in taut state. The upper and lower ends of the g...
Embodiment 2
[0031] In this embodiment, a jack is used as the dilator. Take the forming of an arch rib in a concrete-filled steel tube arch bridge as an example. The outer diameter of the steel pipe of the arch rib is 1200mm, and the wall thickness is 20mm. The concrete adopts micro-expansion self-compacting concrete, the strength grade is C80, the initial setting time is 6 hours, and the final setting time is 10 hours. In order to improve the anti-debonding ability between the formed steel pipe and the internal concrete, the following construction scheme is adopted:
[0032] Considering that the debonding or debonding of concrete 2 and steel pipe 1 generally occurs at the vault, before erecting the arch-rib steel pipe section, set the jack 4 only in the steel pipe section corresponding to the vault, as Figure 4 shown. The jack 4 is suspended in the steel pipe 1 with a thin wire rope, and is in a horizontal state. The jack 4 is solid and has an oil inlet pipe 7. The inner diameter of...