[0039] See image 3 , is a schematic flowchart of a method for preparing a checkered steel plate provided in an embodiment of the present application. Such as image 3 The shown method includes the following implementation steps:
[0040] S301. The production process of checkered steel plate is as follows: hot metal desulfurization, converter smelting, argon blowing, ladle furnace refining, thin slab continuous casting, soaking furnace, phosphorus removal, finishing rolling, laminar cooling, coiling, finishing, inspection and packaging.
[0041] S302. Control the exit temperature of the slab continuously cast in the thin slab continuous casting stage in the soaking furnace stage.
[0042] In the stage of controlling the temperature of the slab out of the furnace (that is, the regulation of the temperature in the furnace during the soaking furnace stage), the target value (ideal value or maximum value) of the slab out of the furnace temperature is set at 1180°C, and the actu...
Embodiment 1
[0071] Example 1: steel type H-Q235-B, checkered steel plate with a specification of 1.5*1000mm
[0072] 1. The actual temperature of the slab coming out of the furnace is 1175°C.
[0073] 2. The strip threading speed of the F7 finishing stand is limited within 9.3m / s~9.5m / s, preferably the actual strip threading speed is controlled at 9.35m / s~9.4m / s.
[0074] 3. The reduction rate of the finishing stand is set at 14% to 14.5%.
[0075] 4. Anti-stripping water sequence, the spray sequence of F1~F4 are: 13.8m, 19.3m, 24.8m and 30.3m respectively.
[0076] 5. Final rolling temperature, control the actual final rolling temperature at 851℃~857℃.
[0077] 6. The crown of the finished product (the section crown of the finished rolling piece), the actual crown of the rolled piece is controlled between 55um and 60um.
[0078] 7. Rolling pressure control. When the rolling width of the rolled piece is 1000mm, the actual rolling pressure of the F7 finishing stand is controlled at 9800...
Embodiment 2
[0081] Example 2: steel type H-Q235-B, checkered steel plate with a specification of 1.6*1000mm
[0082] 1. The actual temperature of the slab coming out of the furnace is 1172°C.
[0083] 2. The strip threading speed of F7 finishing stand is limited to 9.3m / s~9.35m / s.
[0084] 3. The reduction rate of the finishing stand is set at 14.5% to 15%.
[0085] 4. Anti-stripping water sequence, the spray sequence of F1~F4 are: 13.8m, 19.3m, 24.8m and 30.3m respectively.
[0086] 5. Final rolling temperature, control the actual final rolling temperature at 857℃~865℃.
[0087] 6. The crown of the finished product (the section crown of the finished rolling piece), the actual crown of the rolled piece is controlled between 50um and 55um.
[0088] 7. Rolling pressure control. When the rolling width of the rolled piece is 1000mm, the actual rolling pressure of the F7 finishing stand is controlled at 9800KN~10300KN.
[0089] 8. The rigidity difference between the two sides of the F6 and...