Climbing frame project construction management system and method thereof

A construction management and project technology, applied in the field of climbing frame project construction management system, can solve problems such as untimely supervision and inadequate responsibility distribution, and achieve the effect of improving scientificity

Pending Publication Date: 2021-12-17
深圳华研筑科技有限公司
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the deficiencies of the prior art, the present invention provides a climbing frame project construction management system and its method, which solves the problems of insufficient responsibility distribution and untimely supervision in project progress management in terms of responsibility system and progress monitoring, etc., and improves The scientificity and practicability of the construction management of the climbing frame project

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Climbing frame project construction management system and method thereof
  • Climbing frame project construction management system and method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0030] Such as figure 1 As shown, the embodiment of the present invention provides a climbing frame project construction management system, the system includes:

[0031] A sensing unit, the sensing unit includes a gravity sensor, a wind speed sensor, an anti-tilt sensor, an automatic leveling device, and a camera, which are used to sense and record various data on the climbing frame;

[0032] The data acquisition module is electrically connected to the gravity sensor, wind speed sensor, anti-tilt sensor, automatic leveling device, and camera to collect and summarize the data recorded by each sensing unit;

[0033] Data comparison module, the data comparison module includes data processing software and a server, through the data comparison module, the data collected by the data acquisition module is compared and analyzed with the data entered in advance by the server;

[0034] The early warning module is connected with the data comparison module, and the data analysis and comp...

Embodiment 2

[0039] Such as figure 2 As shown, the embodiment of the present invention provides a construction management method for a climbing frame project, including the following steps:

[0040]Data entry: enter the relevant information of the project in the background of the system, and enter the information of the relevant personnel according to the project information, and set the corresponding authority and initial password according to the position of the relevant personnel;

[0041] Install the data acquisition device: install the data acquisition device on the support rod of the climbing frame, the connection between the climbing frame and the ground and reinforce them, and connect the data acquisition device and the early warning device to the terminal through a wireless transmission device;

[0042] Data comparison: the data comparison module summarizes the data collected by each data acquisition module in the main control box, then compares the measured data with the data en...

Embodiment 3

[0046] Such as figure 2 As shown, in the installation data acquisition device, the gravity sensor records the pressure data of the climbing frame at each point in contact with the ground, the wind speed sensor is installed on the top of the climbing frame, and is used to monitor the wind speed at the site on the day of construction, and the anti-tilt sensor is installed on the climbing frame. Between the bottom of the climbing frame and the ground, it is used to monitor the pressure of the side facing the anti-dumping sensor when the climbing frame has a tendency to tip over. The automatic leveling device is used to sense and adjust the balance of the transportation platform on the climbing frame. The cameras are respectively installed on the climbing frame. The surface of the pole and the data comparison module are used for real-time monitoring and image acquisition respectively. The input data is to enter the relevant personnel information of the climbing frame subcontracti...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a climbing frame project construction management system and method, and relates to the technical field of project management of constructional engineering, and the system comprises a sensing unit, a data acquisition module, a data comparison module, an early warning module, a wireless transmission module, and a control module. The sensing unit comprises a gravity sensor, a wind speed sensor, an anti-inclination sensor, an automatic leveling device and a camera and is used for sensing and recording various data on the climbing frame, the data acquisition module is used for acquiring and summarizing the data recorded by each sensing unit, and the project summarization referring to summarizing and evaluating projects responsible by each subpackaging unit through a system background, according to a plane layout diagram or calculation of perimeter data, a project amount is completed, contract terms are matched to calculate monthly receivable accounts, data of each subpackage unit is sorted independently, various corresponding files are generated, and the files can be transmitted to a mobile terminal of a principal of each subpackage unit through a wireless transmission module.

Description

technical field [0001] The invention relates to the technical field of construction engineering project management, in particular to a climbing frame project construction management system and a method thereof. Background technique [0002] Project management refers to the process of using specialized knowledge, skills, tools and methods in project activities to enable the project to achieve or exceed the set requirements and expectations under the limited conditions of limited resources. Project management is the overall monitoring and control of activities (such as tasks) related to the successful achievement of a set of objectives. This includes planning, scheduling and maintaining the progress of the activities that make up the project. Construction project management is an important factor in the construction of engineering construction in our country, and it is also a practical measure to transform fixed asset investment into real productivity. All must run through th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04N7/18G08B21/18E04G3/28
CPCH04N7/18G08B21/18E04G3/28
Inventor 王成义林俊天张继敏
Owner 深圳华研筑科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products