Climbing frame project construction management system and method thereof
A construction management and project technology, applied in the field of climbing frame project construction management system, can solve problems such as untimely supervision and inadequate responsibility distribution, and achieve the effect of improving scientificity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as figure 1 As shown, the embodiment of the present invention provides a climbing frame project construction management system, the system includes:
[0031] A sensing unit, the sensing unit includes a gravity sensor, a wind speed sensor, an anti-tilt sensor, an automatic leveling device, and a camera, which are used to sense and record various data on the climbing frame;
[0032] The data acquisition module is electrically connected to the gravity sensor, wind speed sensor, anti-tilt sensor, automatic leveling device, and camera to collect and summarize the data recorded by each sensing unit;
[0033] Data comparison module, the data comparison module includes data processing software and a server, through the data comparison module, the data collected by the data acquisition module is compared and analyzed with the data entered in advance by the server;
[0034] The early warning module is connected with the data comparison module, and the data analysis and comp...
Embodiment 2
[0039] Such as figure 2 As shown, the embodiment of the present invention provides a construction management method for a climbing frame project, including the following steps:
[0040]Data entry: enter the relevant information of the project in the background of the system, and enter the information of the relevant personnel according to the project information, and set the corresponding authority and initial password according to the position of the relevant personnel;
[0041] Install the data acquisition device: install the data acquisition device on the support rod of the climbing frame, the connection between the climbing frame and the ground and reinforce them, and connect the data acquisition device and the early warning device to the terminal through a wireless transmission device;
[0042] Data comparison: the data comparison module summarizes the data collected by each data acquisition module in the main control box, then compares the measured data with the data en...
Embodiment 3
[0046] Such as figure 2 As shown, in the installation data acquisition device, the gravity sensor records the pressure data of the climbing frame at each point in contact with the ground, the wind speed sensor is installed on the top of the climbing frame, and is used to monitor the wind speed at the site on the day of construction, and the anti-tilt sensor is installed on the climbing frame. Between the bottom of the climbing frame and the ground, it is used to monitor the pressure of the side facing the anti-dumping sensor when the climbing frame has a tendency to tip over. The automatic leveling device is used to sense and adjust the balance of the transportation platform on the climbing frame. The cameras are respectively installed on the climbing frame. The surface of the pole and the data comparison module are used for real-time monitoring and image acquisition respectively. The input data is to enter the relevant personnel information of the climbing frame subcontracti...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com