Anti-freezing method and device for tunnel fire-fighting pipeline in cold region
An anti-freezing technology in cold areas, applied in mining equipment, earth cube drilling, mining equipment, etc., can solve the problems of long freezing period, high energy consumption, high operating cost of electric heating system, etc. Energy saving and emission reduction, simple composition effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A single-hole, one-way, two-lane expressway tunnel in a cold area in Shaanxi. The tunnel is 8,010 meters long. The tunnel’s freezing period is about 4 months, and the daily temperature at the entrance of the tunnel is -16°C to -22°C. The fire supervisor in the weak current cable trench of the tunnel adopts DN200, and the two weak current cable trenches at the entrance and exit of the left and right tunnels are equipped with a 2,500-meter sealed rock wool insulation layer with a thickness of 0.03m. The investment in laying the sealed insulation layer is about 110,000 yuan. After laying the sealing insulation layer, the weak current cable trench of the tunnel is sealed and the thermal insulation is enhanced, which delays the freezing time of the fire-fighting pipeline for about 9 hours, reduces the number and time of electric auxiliary heating of the fire-fighting pipeline, saves about 296,000 degrees of energy per year, and saves 356,000 funds Yuan.
Embodiment 2
[0031] A single-hole, one-way, two-lane expressway tunnel in a cold area in Gansu. The tunnel is 1,900 meters long. The tunnel’s freezing period is about 4 months, and the daily temperature at the entrance of the tunnel is -18°C to -24°C. DN150 is used for the fire protection supervisor in the weak current trench of the tunnel. The two weak current cable trenches at the entrance and exit of the left and right tunnels are equipped with a 1900-meter sealed rock wool insulation layer with a thickness of 0.03m. The investment for laying the sealed insulation layer is about 70,000 yuan. After laying the sealing insulation layer, the weak current cable trench of the tunnel is sealed and the thermal insulation is enhanced, which delays the freezing time of the fire-fighting pipeline for about 8 hours, reduces the number and time of electric auxiliary heating of the fire-fighting pipeline, saves about 75,000 degrees of energy per year, and saves 80,000 funds Yuan.