[0021] In this embodiment, the hole forming of the Ganyu cross-road pipe gallery project is taken as an example to illustrate:
[0022] The hole-forming pouring method of the breakwater grouting pile of the present embodiment comprises the following steps:
[0023] Step 1. Preparation before construction:
[0024] The machine adopts a steel wire rope impact drilling rig. The impact hammer has a large diameter of 10,000mm, a hammer weight of 3,000kg, and a hammer height of 2 meters. The casing is gradually lowered to the bottom of the pile with the impact hammer. Before starting the construction, use the road breaker to break the road surface out of the working surface (2 meters more broken than the size of the design drawing, and the depth is 2 meters, which is used for the later deployment of mud), and use the excavator to dig down 3 meters. C35 concrete cushion is poured in the middle of the casing and within 2m outside the outer casing, with a thickness of 100mm. After 2 d...
PUM
| Property | Measurement | Unit |
|---|---|---|
| The inside diameter of | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information