Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method for a karst tunnel to penetrate through a high-water-level underground river and water guide structure

A technology of a water-conducting structure and construction method, which is applied in tunnels, tunnel linings, drainage, etc., can solve the problems of large water inflow in dark rivers, structural damage, and difficult control of waterproofing and drainage.

Active Publication Date: 2022-02-08
RES INST OF HIGHWAY MINIST OF TRANSPORT +1
View PDF7 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002]Construction of tunnels in karst areas, where underground karst pipelines and underground river systems are well developed, will inevitably encounter the threat and challenge of water inrush. Difficult, improper treatment may easily lead to serious accidents such as tunnel submersion, surrounding rock instability, structural damage, and even serious casualties
[0003]At present, tunnels in karst areas are passing through underground rivers. According to on-site excavation to reveal the development of underground rivers, bridges are generally used to cross over, and drainage tunnels are added under the tunnels to drain water. However, when the intersection of the tunnel and the underground river is at the upper part of the tunnel section, the underground river has a large amount of water inflow and the river slope is gentle, and the height difference between the upstream and downstream exposure points is small, the traditional treatment method for the underground river is no longer applicable.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for a karst tunnel to penetrate through a high-water-level underground river and water guide structure
  • Construction method for a karst tunnel to penetrate through a high-water-level underground river and water guide structure
  • Construction method for a karst tunnel to penetrate through a high-water-level underground river and water guide structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0052] figure 1 For karst tunnel according to the present invention to cross the high water level dark river construction method flow chart, below will refer to figure 1 , the construction method of the karst tunnel crossing the high water level underground river of the present invention is described in detail.

[0053] Firstly, in step 101, the underground river is surveyed, and the underground river topographic plan and typical profile are drawn.

[0054] In the embodiment of the present invention, means such as geological survey and measurement are used to confirm the trend, scale, elevation, flow rate, surrounding rock conditions, etc. of the underground river in the cave, and to draw the topographic plan and typical section of the underground river.

[0055] In step 102, a tunnel is excavated across the underground river section.

[0056] In the embodiment of the present invention, when the section of the tunnel crossing the underground river is excavated, the step-by-s...

Embodiment 2

[0080] The embodiment of the present invention also provides a karst tunnel passing through a high water level underground river water guide structure, Figure 4 It is a schematic diagram of a karst tunnel crossing a high water level dark river water guiding structure according to the present invention, Figure 5 Set schematic diagram for the water inlet of karst cave pipeline according to the present invention, Image 6 A schematic diagram is set for the water outlet of the karst cave pipeline according to the present invention, such as Figure 4-6 As shown, the karst tunnel of the present invention passes through the high water level underground river water guide structure, including the water inlet side water guide pipe 5, the upper span section water guide pipe 6, the water outlet side water guide pipe 7, the column 8, the diagonal brace 9, Beam 10, U-shaped concrete base 11, and steel flower tube 12, wherein,

[0081] The water guide pipe 5 on the water inlet side, the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A construction method for a karst tunnel to penetrate through a high-water-level underground river comprises the following steps that (1) a three-step substep method is adopted for excavating a tunnel to penetrate through an underground river section; (2) a water guide structure which passes through the high-water-level underground river and is in a bridge type overpass tunnel is constructed; (3) a retention wall is arranged around a water inlet of the water guide structure, a runoff path of the underground river is blocked, and water is guided into a water guide pipeline pre-buried in the retention wall; and (4) a water retaining wall is arranged around a water outlet of the water guide structure, and it is guaranteed that water in the underground river pipeline does not flow back into the tunnel range. The invention further provides a water guide structure for construction of the karst tunnel penetrating through the high-water-level underground river, large-flow underground water of the underground river is exposed in tunnel construction, the underground river is guided to the downstream of the underground river in an above-crossing tunnel conduction mode, tunnel construction can be recovered as soon as possible, the underground water environment is protected, and the large-flow underground water pumping and draining cost is saved.

Description

technical field [0001] The invention relates to the technical field of tunnel construction, in particular to a construction method for a karst tunnel crossing a high-water-level underground river and a water-guiding structure. Background technique [0002] In the construction of tunnels in karst areas, underground karst pipelines and underground river systems are well developed in the area, and they will inevitably encounter the threat and challenge of water inrush. It is difficult to control drainage during the construction period, and improper treatment may easily cause tunnel submersion, surrounding rock instability, and structural damage. damage, and even cause serious accidents such as heavy casualties. [0003] At present, tunnels in karst areas are passing through underground rivers. According to the development of underground rivers revealed by on-site excavation, bridges are generally used to cross them, and drainage tunnels are added under tunnels to drain water. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/04E21D11/10E21D11/15E21D11/38E21F16/02E21F17/00
CPCE21D9/04E21D11/10E21D11/105E21D11/15E21D11/38E21F16/02E21F17/00Y02E10/20
Inventor 张翾黄俊谍罗江蔚万飞陈俊典李欣甘恭锞冯春蕾
Owner RES INST OF HIGHWAY MINIST OF TRANSPORT