Waste rock-dry tailing combined stockpiling method
A technology for dry tailings and waste rock, applied in the field of waste rock-dry tailings combined storage, can solve problems such as complex construction process, and achieve the effects of reducing costs, saving construction and operating costs, and reducing pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] The waste rocks and dry tailings and other wastes mined in the mine are jointly stored in the way of "vertical layering and horizontal slitting".
[0036] The vertical stratification, that is, the waste rock and dry tailings are stored on multiple steps, and the height of a single step is between 5-12m. Among them, before the joint pile construction, a large waste rock layer is laid on the bottom of the pile first, and after rolling, it will be used as a seepage drainage layer at the bottom of the combined pile yard to ensure smooth drainage of the base, thereby improving the overall stability of the combined pile.
[0037] The horizontal slitting means that waste rocks and dry tailings are distributed alternately in strips at a certain interval in the plane direction. Among them, when each step is piled up, hard rocks are used to pile up waste rock dams on the periphery first, and the slope angle of the dam body should be smaller than the natural repose angle of waste ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com