Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method for grouting cast-in-place pile after dry drilling, soil squeezing and hole forming in hard stratum

A technology of cast-in-situ piles and formations, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of inability to achieve pile side threads, difficulty in matching the drilling speed and rotation speed, etc., and achieve the expansion of pile ends Increased contact area, pile side friction resistance, and obvious soil squeezing effect

Pending Publication Date: 2022-05-06
广东巨源工程技术有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

It is not a big problem to match the drilling speed and running speed in general cohesive soil, but for hard formations, it is difficult to match the running speed and rotation speed, that is, it is impossible to achieve pile side threading.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for grouting cast-in-place pile after dry drilling, soil squeezing and hole forming in hard stratum
  • Construction method for grouting cast-in-place pile after dry drilling, soil squeezing and hole forming in hard stratum
  • Construction method for grouting cast-in-place pile after dry drilling, soil squeezing and hole forming in hard stratum

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0052] In order to make the purpose, technical solution and advantages of the present invention more clear and complete so that those skilled in the art can reproduce the present invention, the present invention will be described in further detail below with reference to the accompanying drawings and examples. It should be understood that the description of the specific embodiments is only used to explain the present invention, not to limit the scope of the present invention.

[0053] Such as Figure 1-9As shown, the grouting pile construction method after dry drilling and extruding soil into holes in hard strata of the present invention is characterized in that it includes the following steps: 1), moving machine positioning: using a special screw pile driver, the pile driver can provide more than 420kN.m Torque, using a special drill pipe 1 and a special hard alloy drill bit 2 to move the pile driver to fix the pile. 2) Forward rotation and squeeze down drilling: During the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for grouting a cast-in-place pile after dry drilling, soil squeezing and hole forming in a hard stratum. The construction method comprises the following steps: 1) moving a machine and positioning; (2) forward rotation, soil squeezing and downward drilling are conducted, specifically, a pile machine rotates forward, a drill bit cuts a hard stratum, cut muck is squeezed towards the periphery of a pile through a screw drill rod, and a small part of muck returns upwards out of the ground; (3) drilling to the elevation of a final hole; (4) pile core concrete is pumped and poured to the bottom of the hole by 1.5-2.5 m, after the final hole standard is met, concrete pumping operation is started to the bottom of the pile, and the pile is rotated forwards and lifted upwards by 1.5-2.5 m at a constant speed while concrete is pumped to the bottom of the pile; (5) forward rotation is conducted, downward re-drilling is conducted by 1.5 m to 2.5 m, and the final hole elevation is reached; according to the cast-in-place pile construction method, the problem that pile forming is difficult in a hard stratum is solved, the vertical compression resistance static load force of a single cast-in-place pile is large, and the occupancy rate of pile body completeness is high.

Description

technical field [0001] The invention relates to the technical field of construction piling, in particular to a construction method of grouting and pouring piles after dry drilling and squeezing soil in hard strata to form holes. Background technique [0002] Definition of hard stratum: 1) sandy pebble layer and gravel layer with heavy conical dynamic penetrating strokes greater than 10 in medium-dense or dense state; 2) cohesive soil in hard state with standard penetration strokes greater than 30 Weathered sandy cohesive soil, the core is soil-like or fragmented; 3) The hard rock strongly weathered formation with a standard penetration blow count greater than 50 blows, the core is massive; 4) The uniaxial saturated compressive strength is greater than 15MPa Moderately weathered soft rock formations. The pile side and pile tip bearing capacity of the above hard ground is extremely high. [0003] In recent years, with the continuous development of the economy and the large-s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/34E02D15/04E02D15/08E02D33/00E02D7/00
CPCE02D5/34E02D15/04E02D15/08E02D33/00E02D7/00
Inventor 杜甫志高柏辉
Owner 广东巨源工程技术有限公司