Construction method of vibration concrete pouring thick-wall tubular pile
A technology of pouring concrete and construction methods, applied in sheet pile walls, foundation structure engineering, buildings, etc., can solve problems such as inability to sink, and achieve the effect of obvious soil squeezing effect, small end resistance, and simple construction process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be further described below in conjunction with accompanying drawing, and the structure and principle of this device are very clear to those skilled in the art. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0024] see figure 1 and figure 2 , the construction method of vibratory grouting concrete thick-walled pipe piles, using vibration-free vibratory hammers, fixtures, inner pipes, outer pipes, intermediate clamp pipes, cranes and pile frames, the specific steps are:
[0025] a. Set the inner tube, outer tube and middle pinch tube together, and the middle pinch tube is set between the inner tube and the outer tube;
[0026] b. Use clamps to fix the three casings;
[0027] c. Open the vibrating hammer to vibrate the three casings, and the soil enters the inner pipe and the middle clamp pipe;
[0028] d. After the vibration sinking is...