Engineering cost whole process node early warning system and operation method thereof

An early warning system and engineering cost technology, applied in the field of engineering cost early warning, can solve the problems of difficulty in accurately describing the internal technical and economic characteristics, difficult cost control nodes of transmission line engineering projects, and low accuracy.

Pending Publication Date: 2022-05-06
ECONOMIC & TECH RES INST OF HUBEI ELECTRIC POWER COMPANY SGCC
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] It is very difficult to predict the cost of transmission line engineering projects in the preliminary work of the project. The traditional method is to use various prediction indicators and price limits to make rough estimates. However, these methods have certain problems, because for transmission For line engineering, each project has its own characteristics, and any estimation based on one or two indicators is difficult to accurately describe the inherent technical and economic characteristics of a project. In the process of project cost prediction, In order to further strengthen the management and control of the project cost process, reduce the cost of power grid construction, reduce pricing errors, prevent project construction and financial risks, promote project construction compliance with laws and regulations, and improve the "lean" level of cost control, it is necessary to carry out early warning on the control nodes of the whole process of project cost
[0003] The early warning system currently used can only perform rough forecasting and estimation work. Not only is the accuracy low, but the operation process is more troublesome, and it is difficult to apply to the early warning of the cost control node of the transmission line project. The improvement makes it suitable for early warning work of control nodes in the whole process of project cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering cost whole process node early warning system and operation method thereof
  • Engineering cost whole process node early warning system and operation method thereof
  • Engineering cost whole process node early warning system and operation method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0096] see figure 1 , figure 2 , a node early warning system for the whole process of engineering cost, including a similar engineering data extraction module 1, a data analysis module 2, a prediction model building module 3, a training result testing module 4, an error correction improvement unit 5, a node division module 6, and node data acquisition Module 7, feature vector extraction module 8, data comparison module 9, early warning module 10, other influencing factors acquisition module 11, cost public information platform 12, data storage module 13, and the error correction improvement unit 5 includes a theoretical value output module 51, Sample value acquisition module 52, mean square error calculation module 53, weight matrix adjustment module 54, the signal input end of described similar engineering data extraction module 1 is connected with the signal output end of data storage module 13, the signal output of similar engineering data extraction module 1 end is conne...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A project cost whole process node early warning system comprises a similar project data extraction module, a data analysis module, a prediction model establishment module, a training result test module, an error correction improvement unit, a feature vector extraction module, a data comparison module and an early warning module. The data analysis module analyzes similar engineering original data to extract a data variable relationship therein, the feature vector extraction module performs feature vector extraction on node data based on PCA principal component analysis, and then the prediction model establishment module constructs a cost prediction model. Then the training result test module tests and operates the constructed model to obtain a theoretical value, the error correction improvement unit adjusts parameters of the prediction model based on an error between the theoretical value and a true value, and finally the data comparison module compares the predicted cost of each node with a normal range value, and performs early warning through the early warning module when the predicted cost exceeds the normal range. According to the design, accurate early warning of the cost management and control node of the power transmission line engineering project is realized.

Description

technical field [0001] The invention belongs to the technical field of engineering cost early warning, and in particular relates to a node early warning system in the whole process of engineering cost and an operation method thereof. Background technique [0002] It is very difficult to predict the cost of transmission line engineering projects in the preliminary work of the project. The traditional method is to use various prediction indicators and price limits to make rough estimates. However, these methods have certain problems, because for transmission For line engineering, each project has its own characteristics, and any estimation based on one or two indicators is difficult to accurately describe the inherent technical and economic characteristics of a project. In the process of project cost prediction, In order to further strengthen the management and control of the project cost process, reduce the cost of power grid construction, reduce pricing errors, prevent proje...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q30/02G06Q50/06G06Q50/08G06K9/62G06N3/00G06N20/10
CPCG06Q10/04G06Q30/0283G06Q50/06G06Q50/08G06N3/006G06N20/10G06F18/2135
Inventor 马莉徐灵风孙利平廖晓红周蠡柯方超杨林汪子兵唐学军张雪霏熊川羽王巍熊一高晓晶李智威张赵阳陈然王琪鑫贺兰菲廖爽邹雨馨明月郭婷
Owner ECONOMIC & TECH RES INST OF HUBEI ELECTRIC POWER COMPANY SGCC
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More