Pile foundation static load test method adopting construction pile as anchor
A technology of static load test and construction of piles, which is applied in the test of basic structure, basic structure engineering, construction, etc., can solve the problems of complex test method, long time, and inconvenient use, and achieve simple testing equipment and easy operation. , the effect of low testing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] A kind of method adopting construction pile as anchorage to carry out pile foundation static load test, this method comprises the following steps:
[0060] S1. Construction preparation, preparation of test supplies such as instruments, meters and data record books for pile foundation static load test, so as to be used for process measurement and data recording of pile foundation static load test, to ensure the accuracy and uniformity of the test;
[0061] S2. The test personnel arrive at the test site after completing step S1, install and debug the instruments and meters they carry, and check the faults of the instruments and meters, so as to ensure the accuracy of the test data and reduce the test error;
[0062] S3. After the instrument debugging is completed, the test personnel install the reaction frame;
[0063] S4. After the reaction force frame is installed, carry out system debugging on the reaction force frame, so as to ensure the accuracy of the reaction force...
Embodiment 2
[0093] A kind of method adopting construction pile as anchorage to carry out pile foundation static load test, this method comprises the following steps:
[0094] S1. Construction preparation, preparation of test supplies such as instruments, meters and data record books for pile foundation static load test, so as to be used for process measurement and data recording of pile foundation static load test, to ensure the accuracy and uniformity of the test;
[0095] S2. The test personnel arrive at the test site after completing step S1, install and debug the instruments and meters they carry, and check the faults of the instruments and meters, so as to ensure the accuracy of the test data and reduce the test error;
[0096] S3. After the instrument debugging is completed, the test personnel install the reaction frame;
[0097] S4. After the reaction force frame is installed, carry out system debugging on the reaction force frame, so as to ensure the accuracy of the reaction force...