Warm-keeping device for winter construction of mixing station and construction method
The technology of mixing station and radiator is applied in the field of winter construction of heating devices in mixing station, which can solve the problems of large silo space, quality influence and low concrete activity in mixing station, so as to reduce the project cost, ensure the quality, improve the Affordable effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
[0031] see Figure 1-6 In the embodiment of the present invention, a heating device for winter construction of a mixing station is provided, which includes a hot water pipe 2, a heat-conducting steel plate 5, a radiator 7, an external air source heat pump unit 8 and a mixing station silo 10. The mixing station The silo 10 is provided with a silo partition wall 6, a thermally conductive steel plate 5 is installed between the silo parti...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


