Prefabricated tubular pile structure suitable for stockyard composite foundation and construction method
A technology of composite foundation and prefabricated pipe piles, which is applied in the field of stockyard structure, can solve the problems of long construction period of cast-in-place concrete, poor horizontal resistance force, large engineering quantity, etc. The effect of the construction site
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] In one or more embodiments, a prefabricated pipe pile structure suitable for stockyard composite foundation is disclosed, combined with figure 1 , specifically comprising: an enlarged disk 1 and a core-filling section 2 arranged at the bottom of the enlarged disk 1, wherein the core-filling section 2 is a solid pipe section in a cylindrical shape; the core-filling section 2 is embedded in a prefabricated pipe pile 4 for a set distance, and There is no secondary connection between the core-filling section 2 and the prefabricated pipe pile 4 , and a gap of a set size is reserved between the core-filling section 2 and the inner wall of the prefabricated pipe pile 4 . The gap can be filled with flexible materials or left empty to form a flexible gap 3 . The flexible gap 3 is interposed between the core-filling section 2 and the prefabricated pipe pile 4, which can cause a small horizontal displacement and a small rotation angle of the enlarged disk 1, and then release a larg...
Embodiment 2
[0040] In one or more embodiments, another prefabricated pipe pile structure suitable for stockyard composite foundation is disclosed, combining figure 2 , specifically includes: an enlarged disk 1 and a core-filling section 2 arranged at the bottom of the enlarged disk 1, the core-filling section 2 is a hollow pipe section in a cylindrical shape, and the prefabricated pipe pile 4 is embedded in the hollow section; the inner wall of the core-filling section 2 is connected with the prefabricated A gap of a set size is reserved between the outer walls of the pipe piles 4 .
[0041] In this embodiment, the core filling section 2 is a hollow pipe section, and the diameter of the hollow pipe section is larger than that of the prefabricated pipe pile 4 , the prefabricated pipe pile 4 can be embedded in the hollow pipe section, and a flexible gap 3 is provided between the hollow pipe section and the prefabricated pipe pile 4 .
[0042]In this embodiment, the enlarged disk 1 and the ...
Embodiment 3
[0045] In one or more embodiments, another prefabricated pipe pile structure suitable for composite foundations of stockyards is disclosed, combining image 3 , specifically includes: an enlarged disk 1 and a core-filling section 2 arranged at the bottom of the enlarged disk 1, wherein the core-filling section 2 includes a hollow pipe section and a solid pipe section arranged in the hollow pipe section, forming a nested structure, and the solid pipe section and the hollow pipe section A space will be formed between the pipe walls of the pipe section, and the space is adapted to the pipe wall of the prefabricated pipe pile 4, so that the prefabricated pipe pile 4 is embedded in the space; in this embodiment, between the outer wall of the prefabricated pipe pile 4 and the inner wall of the hollow pipe section, and A flexible gap 3 of a set size is reserved between the inner wall of the prefabricated pipe pile 4 and the outer wall of the solid pipe section.
[0046] In this embod...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


