Polymer displaced steam injecting hot oil deposit exploiting method
A steam injection and oil reservoir technology, applied in the direction of production fluid, earthwork drilling, wellbore/well components, etc., can solve the problems that thermal recovery cannot be applied
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0026] The buried depth of the oil reservoir in oilfield 1 is 1000m, the effective thickness of the oil layer is 13.0m, the net total thickness ratio is 0.5, the average porosity is 24.0%, the average permeability is 200md, the permeability variation coefficient is 0.7, and the crude oil viscosity under the oil layer conditions is 4.5mPa. s. At present, the oil field adopts polymer injection, and the water cut is relatively high, and the degree of staged recovery reaches about 50.0%.
[0027] 1) Carry out rough screening according to the geological characteristics of the reservoir, crude oil properties and development status. The reservoir meets the following conditions: reservoir depth 0.30, total reservoir thickness > 5.0m, net-to-total thickness ratio > 0.3, reservoir porosity > 0.15, permeability variation coefficient < 0.8.
[0028] 2) Choose the reverse 7-point well pattern, and use the newly drilled well as the steam injection well, with the well spacing between the i...
Embodiment 2
[0033] The buried depth of oil field 2 is 300-500m, the effective thickness of the oil layer is 21.0m, the ratio of net total thickness is 0.46, the average porosity is 20%, the average permeability is 200md, the coefficient of variation of permeability is 0.65, and the viscosity of crude oil under the condition of oil layer is 10 -30mPa.s, the original geological reserves are 130 million tons. At present, the oil field adopts polymer injection, and the water cut is relatively high, and the degree of staged recovery reaches about 40.0%.
[0034] 1) Carry out rough screening according to the geological characteristics and development status of the oilfield. The reservoir meets the following conditions: reservoir depth 0.30, total reservoir thickness > 5.0m, net-to-total thickness ratio > 0.3, reservoir porosity > 0.15, permeability variation coefficient < 0.8.
[0035] 2) Select the reverse 5-point well pattern, and use the newly drilled wells as steam injection wells, and th...
Embodiment 3
[0039] The buried depth of oilfield 3 reservoir is 1600m, the effective thickness of oil layer is 21.0m, the ratio of net to total thickness is 0.56, the average porosity is 20%, the average permeability is 200md, the coefficient of variation of permeability is 0.60, and the viscosity of crude oil under oil layer conditions is 4-8mPa .s, the original geological reserves are 230 million tons. At present, the oil field adopts polymer injection, and the water cut is relatively high, and the degree of staged recovery reaches about 45.0%.
[0040] 1) Carry out rough screening according to the geological characteristics and development status of the oilfield. The reservoir meets the following conditions: reservoir depth 0.30, total reservoir thickness > 5.0m, net-to-total thickness ratio > 0.3, reservoir porosity > 0.15, permeability variation coefficient < 0.8.
[0041] 2) Select the reverse 9-point well pattern, and use the newly drilled wells as steam injection wells, and the w...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com