Tchnology of internal for tubing of drilling well
A technology of inner coating and pipe, which is applied in the direction of drill pipe, drilling equipment, drill pipe, etc., can solve the problems of short service life and narrow application range, improve corrosion resistance and wear resistance, reduce floor space, expand The effect of application range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
specific Embodiment approach
[0014] An inner coating process of pipes for drilling, including thread cleaning, heat cleaning and surface sandblasting of the pipes in the early stage, characterized in that the inner coating process of pipes for drilling is operated according to the following steps:
[0015] (1) Spray the pre-treated pipe with epoxy phenolic resin coating TC2000 series, and then bake it. The baking temperature is 120-150°C and the baking time is 50-70 minutes;
[0016] (2) After the pipe is cooled, it is sprayed with epoxy phenolic resin coating TC2000 series, and then baked. The baking temperature is 120-150 ° C, and the baking time is 50-70 minutes;
[0017] (3) Curing treatment: put the pipe into a continuous furnace for curing treatment, the curing temperature is 200-240° C., and the curing time is 60 minutes.
[0018] There is a partition wall between the surface sandblasting treatment area of the pipe in the early stage and the primer spraying area. The partition wall is a wall with...
Embodiment 1
[0020] Example 1: The pipe is a 5-inch drill pipe, the primer baking temperature is 140°C, the baking time is 60 minutes, the topcoat baking temperature is 140°C, the baking time is 60 minutes, the curing temperature is 240°C, and the curing time is 60 minutes. The time is 60 minutes, and the implementation effect: through performance testing, the coating quality is considered to be in full compliance with the indicators in the petroleum industry standard SY / T0544-1995; the application effect is good in various domestic oil fields, and the drilling depth exceeds 6000 meters.
Embodiment 2
[0021] Example 2: The pipe is a 3.5-inch oil pipe, the primer baking temperature is 130°C, the baking time is 50 minutes, the topcoat baking temperature is 130°C, the baking time is 50 minutes, the curing temperature is 220°C, the curing time It takes 60 minutes to implement the effect: through performance testing, the quality of the coating is considered to be in full compliance with the indicators in the petroleum industry standard SY / TO544-1995; the application effect is good in various domestic oil fields, and the coating is tested in different corrosive media and the temperature is as high as 150 ℃ Oil production wells and water injection wells have been used for a long time, and the coating has not been damaged.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com