Fluorine-removing process for zinc sulphate solution
A zinc sulfate solution and process technology, applied in the direction of zinc sulfate, etc., can solve the problems of difficult recovery of valence metals, large loss of zinc and acid, difficult to control and other problems, and achieve the effects of low operating cost, easy operation and time saving.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0023] Take 3000mL of a neutral leachate containing F - 274.6mg / L, containing Zn 2+ to 91.6g / L, heated to 50°C, first added Al 2 (SO 4 ) 3 12H 2 O, after being dissolved, add Na dissolved in a small amount of water 3 PO 4 12H 2 O, Al 3+ with F - The mass ratio is 6:1, PO 4 3- with F - The mass ratio of F - Precipitation occurred, vacuum filtration, and the filter residue was discarded to obtain 3100 mL of defluorinated liquid, which contained F - 118.4mg / L, containing Zn 2+ 71.3g / L, the defluorination rate is 55.4%, and the zinc loss rate is 19.6%.
Embodiment 2
[0025] Take 4000mL of a neutral leachate containing F - 274.6mg / L, containing Zn 2+ to 91.6g / L, heated to 60°C, and added Al first 2 (SO 4 ) 3 12H 2 O, after being dissolved, add Na dissolved in a small amount of water 3 PO 4 12H 2 O, Al 3+ with F - The mass ratio is 6:1, PO 4 3- with F - The mass ratio is 10:1, the control process is PH≈5, and after 70 minutes of action, the F - Precipitation occurs, vacuum filtration, and the filter residue is discarded to obtain 4080 mL of defluorinated liquid, which contains F - 105.0mg / L, containing Zn 2+ 75.0g / L, the defluorination rate is 61%, and the zinc loss rate is 16.48%.
Embodiment 3
[0027] Take 5000mL of a neutral leachate containing F - 274.6mg / L, containing Zn 2+ to 91.6g / L, heated to 70°C, first added Al 2 (SO 4 ) 3 12H 2 O, after being dissolved, add Na dissolved in a small amount of water 3 PO 4 12H 2 O, Al 3+ with F - The mass ratio is 6:1, PO 4 3- with F - The mass ratio is 10:1, the control process is PH≈5.0, and after 100 minutes of action, the F - Precipitation occurred, vacuum filtration, and the filter residue was discarded to obtain 5120 mL of defluorinated liquid, which contained F - 107.2mg / L, containing Zn 2+ 78.5g / L, the defluorination rate is 60.0%, and the zinc loss rate is 12.24%.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com