Method for producing absorbent quality blended fibre
A blended fiber and hygroscopic technology, which is applied in the field of preparation of hygroscopic blended fibers, can solve the problems of high spinneret processing technology and difficulty in popularization, and achieve low cost, excellent environmental friendliness, and high processing technology. simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Put the CAB powder in a vacuum dryer with a vacuum degree of ≤0MPa, a temperature of 120°C, and a time of 12 hours. After being fully dried, it is extruded into strands on a Thermo Hakke EUROLAB-16 twin-screw extruder with a screw temperature of 260°C. Cut into pellets with a pelletizer to obtain CAB slices.
[0026] The CAB slices and MPET slices were respectively placed in a vacuum drum dryer, the drying temperature of the CAB slices and the MPET slices was 120 ° C, and the drying time was 24 hours; the dried CAB slices and MPET slices were mixed (the CAB slices and the MPET slices were mixed). The weight percentages of slices are respectively 2.5% and 97.5%), and then placed in a vacuum drum dryer at a temperature of 120° C., mixed and dried for 1.5 hours to obtain mixed slices with a moisture content of less than 50 ppm.
[0027] Adopt Japanese ABE composite spinning machine, the temperature of each area of the screw is 300°C, the temperature of the box is 310°C, ...
Embodiment 2
[0033] Put the CP powder in a vacuum dryer with a vacuum degree of ≤0Mpa, a temperature of 100°C, and a time of 16 hours. After being fully dried, it is extruded into strands on a Thermo Hakke EUROLAB-16 twin-screw extruder with a screw temperature of 220°C. Cut into pellets with a pelletizer to obtain CP slices.
[0034] The CP slices and PP slices were placed in a vacuum drum dryer respectively, and the drying temperatures of the CP slices and PP slices were 120°C and 100°C respectively, and the drying time was 16 hours; the dried CP slices and PP slices were mixed (where CP Slices and PP slices weight percentages are 20% and 80% respectively), and then placed in a vacuum drum dryer at a temperature of 110° C., mixed and dried for 2 hours to obtain mixed slices with a moisture content of less than 50PPM.
[0035]Using Japanese ABE composite spinning machine, the temperature of each zone of the screw is 285°C, 295°C, 295°C, 295°C, 295°C, the box temperature is 270°C, the pump...
Embodiment 3
[0041] Put the CB powder in a vacuum dryer with a vacuum degree of ≤0MPa, a temperature of 80°C, and a time of 24 hours. After being fully dried, extrude it into strands on a Thermo Hakke EUROLAB-16 twin-screw extruder with a screw temperature of 230°C. Cut into pellets with a pelletizer to obtain CB slices.
[0042] Place the CB slices and PET slices in a vacuum drum dryer respectively, the drying temperatures of the CB slices and the PET slices were 100°C and 130°C, respectively, and the time was 24 hours; the dried CB slices and PET slices were mixed (where CB Slices and PET slices are 10% and 90% by weight respectively), then placed in a vacuum drum dryer at a temperature of 100°C, mixed and dried for 2 hours to obtain mixed slices with a moisture content of less than 50PPM.
[0043] Using Japanese ABE compound spinning machine, the temperature of each area of the screw is 290 °C, the temperature of the box is 315 °C, the pump supply is 45 g / min, the winding speed is 600...
PUM
| Property | Measurement | Unit |
|---|---|---|
| elongation at break | aaaaa | aaaaa |
| water absorption | aaaaa | aaaaa |
| elongation at break | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 