Temporary plugging agent for acidization of water injection well of low permeability reservoir
A technology of oilfield water injection and temporary plugging agent, which is applied in the field of temporary plugging agent, and can solve the problems of small distance between water injection layers, small distance between perforation sections, inability to use packer acidification profile control, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0013] The acidizing temporary plugging agent for water injection wells in low-permeability oil fields is composed of sodium stearate: sodium tetraborate: acrylic resin No. I = 3: 1: 6 ratio by weight; the polyacrylamide aqueous solution with a mass concentration of 0.2% is used as the temporary plugging agent The mass concentration of the carrier fluid and temporary plugging agent is 10%, and the construction pressure is 1MPa higher than the water injection pressure. For the wells with general profile control and water plugging within or between layers, the low-pressure and slow-velocity method is used to inject; the injection rate is kept at 10m 3 / h. A filter cake with low permeability is formed near the borehole wall, which can effectively prevent temporary plugging agent particles from invading deep into the oil and gas reservoir. At the same time, the temporary plugging agent has good compatibility with water, acid liquid and its additives under the formation conditions....
Embodiment 2
[0015] The acidizing temporary plugging agent for water injection wells in low-permeability oilfields is composed of calcium stearate: zinc borate: acrylic resin No. II = 3:1:6 ratio by weight; polyacrylamide aqueous solution with a mass concentration of 0.2% is used as the temporary plugging agent The mass concentration of temporary plugging agent is 10%, and the construction pressure is 2 MPa higher than the water injection pressure. For the wells with general profile control and water plugging in layers or between layers, low-pressure and slow-velocity injection is adopted; the injection rate is kept at 12m 3 / h. A filter cake with low permeability is formed near the borehole wall, which can effectively prevent temporary plugging agent particles from invading deep into the oil and gas reservoir. At the same time, the temporary plugging agent has good compatibility with water, acid liquid and its additives under the formation conditions. When the acidification plays the role...
Embodiment 3
[0017] The acidizing temporary plugging agent for water injection wells in low-permeability oil fields is composed of magnesium stearate: boric acid: acrylic resin No. III = 3: 1: 6 ratio by weight; the polyacrylamide aqueous solution with a mass concentration of 0.2% is used as the temporary plugging agent carrier fluid , the mass concentration of temporary plugging agent is 10%, and the construction pressure is 1.5 MPa higher than the water injection pressure. For the wells with general profile control and water plugging in layers or between layers, low-pressure and slow-velocity injection is adopted; the injection rate is kept at 15m 3 / h. A filter cake with low permeability is formed near the borehole wall, which can effectively prevent temporary plugging agent particles from invading deep into the oil and gas reservoir. The temporary plugging agent has good compatibility with water, acid liquid and its additives under the formation conditions. Blocking situation.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com