Construction waste comprehensive treatment method

A construction waste, comprehensive treatment technology, applied in construction waste recycling, recycling technology, solid waste removal and other directions, can solve problems affecting the processing and final quality of building materials products, unreasonable arrangement of magnetic separation steps, uneven particle size of recycled aggregates problems, to achieve the effect of high product strength, complete crushing and uniform particle size

Inactive Publication Date: 2011-04-13
潍坊大于环保建材有限公司
View PDF5 Cites 37 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] At present, the construction waste treatment process is also used to process construction waste, but the existing treatment process is not perfect, most of the recycled aggregates after treatment have uneven particle size, and the scope of application is limited
And because the construction waste contains a large amount of metal, bamboo and plastic sundries, among which the bamboo, wood and plastic sundries are crushed together with the construction waste and mixed in the recycled aggregate, which is very important for the manufacture of load-bearing building materials. It will reduce the strength, and metal debris is generally difficult to break, and it is easy to cause equipment blockage if left in the processing process, affecting the normal use of the equipment, and even shutting down the maintenance to affect the production process. If the metal debris is mixed in the produced recycled In the aggregate, it will also affect the processing and final quality of building materials
However, the existing construction waste treatment methods do not sort bamboo, wood and plastic debris, but only perform magnetic separation on metal debris, and the arrangement of the magnetic separation steps is unreasonable, and the magnetic separation device used is not only expensive And the sorting effect is not ideal

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction waste comprehensive treatment method
  • Construction waste comprehensive treatment method
  • Construction waste comprehensive treatment method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] Such as Figure 1 to Figure 3 Commonly shown, a comprehensive processing method for construction waste, which includes the following processing steps:

[0035] (1) Primary crushing: The construction waste raw materials are sent to the primary crusher 11 for crushing, and then output to the sorting device through the discharge port 112 of the primary crusher 11 . Among them, the primary crusher 11 is preferably a jaw crusher, which can crush relatively large construction waste, and the particle size of the recycled aggregate after crushing is relatively uniform. The primary crusher 11 is provided with an inclined feeding port 111, and the construction waste can be directly fed into the feeding port 111 through the loader.

[0036] (2) Sorting: the sorting device sorts and removes the metal, bamboo and wood and plastic debris in the construction waste, and outputs the sorted construction waste to the primary magnetic separation device 21 . Wherein, the sorting device in...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction waste comprehensive treatment method which comprises the following steps: primary crushing, sorting, primary magnetic separation, secondary crushing, secondary magnetic separation, primary screening, tertiary crushing and tertiary screening. The construction waste comprehensive treatment method can be used for thoroughly sorting foreign matters in the construction waste, thereby enhancing the quality of the regenerative aggregate. The invention has the advantages of reasonable procedure arrangement, low labor consumption and high efficiency, and is simple to operate. When being used for treating construction waste, the method has the social benefits of saving land resources and reducing environmental pollution.

Description

technical field [0001] The invention relates to the technical field of construction waste treatment. Background technique [0002] With the acceleration of urbanization, the construction waste generated by urban construction and old city renovation has become a major public hazard in the city. According to relevant data, at present, the solid waste generated by the demolition of buildings in my country is about 200 million tons, and the solid waste generated by new buildings is about 100 million tons, and the total of the two items is about 300 million tons. my country's existing buildings are 40 billion square meters. According to the calculation of the building's service life of 100 years, the average annual building demolition is 400 million square meters, and the average annual construction waste is 500 million tons. In addition, the total construction waste generated by construction and building decoration is 600 million. In fact, due to the durability of buildings and ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B09B3/00B09B5/00
CPCY02W30/58
Inventor 于增寿
Owner 潍坊大于环保建材有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products