A treatment method and nutrient technology, applied in water/sewage multi-stage treatment, water/sludge/sewage treatment, chemical instruments and methods, etc., can solve problems such as difficult governance, polluted environment, complex water quality, etc., to reduce pollution emissions, environmental protection, and less investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] Embodiment 1, according to figure 1 Shown technological process, its treatment process is as follows:
[0017] 1. The measured pH value of the treated sewage is 4.0 and the COD value is 500. The sewage is introduced into the sealed pool for oxygen isolation treatment; the capacity of the sealed pool is 15M*10M*3M, and it is divided into three connected pools No. 1, No. 2, and No. 3. When No. 1 pool is full, it enters No. 2 pool through the overflow port , No. 2 pool is full and enters No. 3 pool through the overflow port. Since the capacity of the sealed pool is 450 cubic meters, the sewage from No. 1 pool to No. 3 pool must stay in the sealed pool for at least 2 hours, or longer At the same time, the sewage is pumped into the membrane pool in No. 3 pool.
[0018] 2. After the workshop sewage is treated with oxygen barrier in the sealed pool, the pH value is 4.5 and the COD value is 400. Then, it is pumped into the membrane tank (also known as the membrane treatment ...
Embodiment 2
[0026] Embodiment 2, according to figure 1 Shown technological process, its treatment process is as follows:
[0027] 1. The measured pH value of the treated sewage is 5.0 and the COD value is 650. The sewage is introduced into the sealed pool for oxygen isolation treatment; the capacity of the sealed pool is 15M*10M*3M, and it is divided into three connected pools No. 1, No. 2, and No. 3. When No. 1 pool is full, it enters No. 2 pool through the overflow port , No. 2 pool is full and enters No. 3 pool through the overflow port. Since the capacity of the sealed pool is 450 cubic meters, the sewage from No. 1 pool to No. 3 pool must stay in the sealed pool for at least 2 hours, or longer At the same time, the sewage is pumped into the membrane pool in No. 3 pool.
[0028] 2. The pH value of the workshop sewage is 5.6 and the COD value is 550 after oxygen barrier treatment in the sealed pool. Then, it is pumped into the membrane tank (also known as the membrane treatment tank...
Embodiment 3
[0036] Embodiment 3, according to figure 1 Shown technological process, its treatment process is as follows:
[0037] 1. The measured pH value of the treated sewage is 6.0 and the COD value is 800. The sewage is introduced into the sealed pool for oxygen isolation treatment; the capacity of the sealed pool is 15M*10M*3M, and it is divided into three connected pools No. 1, No. 2, and No. 3. When No. 1 pool is full, it enters No. 2 pool through the overflow port , No. 2 pool is full and enters No. 3 pool through the overflow port. Since the capacity of the sealed pool is 450 cubic meters, the sewage from No. 1 pool to No. 3 pool must stay in the sealed pool for at least 2 hours, or longer At the same time, the sewage is pumped into the membrane pool in No. 3 pool.
[0038] 2. The pH value of the workshop sewage is 6.5 and the COD value is 700 after oxygen barrier treatment in the sealed pool. Then, it is pumped into the membrane tank (also known as the membrane treatment tank...