Wake-up method of formation pressure testing while drilling
A formation pressure, while drilling technology, applied in the direction of measurement, earthwork drilling, wellbore/well components, etc., can solve the problems of increasing drilling costs, increasing the well construction period, and data cannot be decoded, so as to increase stability, wellhead Simplify the device and reduce the effect of the transducer
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010] A kind of formation pressure test wake-up method while drilling provided by the specific embodiment of the present invention (see figure 1 and figure 2 ), the wake-up method of formation pressure test while drilling includes: firstly, inserting the instrument into the drilling tool assembly and going downhole, when reaching the layer to be tested, operate according to the following steps: 1. The controller starts the mud pump and monitors the flow of mud , start timing when the mud flow reaches the power supply flow, and then turn off the mud pump. When the mud flow is less than the critical power supply flow, it is regarded as a power failure, and the control power supply time does not exceed 1min; , to fully discharge the capacitor, repeat step 1; 3. Timing after power-off, after the power-off time exceeds 40s, fully discharge the capacitor, start long-term power supply, until the end of the test action.
[0011] The realization of the wake-up command of the presen...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 