The invention discloses a
new energy tracking / networking converter capacity configuration method based on a power angle stability boundary, and the method comprises the steps: firstly, building a
new energy sending
end system simulation model containing a networking converter, and calculating a steady-state
operation point of a
system; then, carrying out dynamic equivalence on the
network construction type converter and a synchronous generator to obtain equivalent
machine parameters, and simplifying an original
simulation system into an equivalent
machine and a network following type
new energy sending
end system; deriving mechanical power and
electromagnetic power of the equivalent
machine before, during and after the fault to obtain a power angle characteristic curve of the equivalent machine; calculating the acceleration area and the maximum deceleration area of an equivalent machine under different proportions of the
network construction type converter, and obtaining the proportion of the
network construction type new energy under the stable
critical power angle of the
system by adopting a dichotomy method;
simulation is carried out based on a PSASP platform, and the rationality of the proposed configuration principle is verified. According to the scheme provided by the invention, the network construction investment of the system can be reduced while the safety and stability of the system are ensured, and the admitting ability of the
power grid to new energy is improved.