Horizontal pre-treatment method for improving copper exposing at bottom of blind drilling hole in soft gold electroplating
A technology for workpiece and copper exposure, applied in the direction of electrical connection formation of printing components, etc., can solve the problems of poor potency of potion filling, exposed copper, exposed copper in blind drilling, etc., to improve the defects, methods and Simple process, improved wetting performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] Embodiment 1 A method for improving the horizontal pretreatment of exposed copper at the bottom of the hole when the blind drilled workpiece is electroplated with soft gold, the steps are:
[0018] (1) Sand blasting: use deionized water to prepare Al with a mass concentration of 10% 2 o 3 Suspension; under 10Bar pressure, with the configured Al 2 o 3 Sandblast the blind drilling workpiece to be processed for 30~40 seconds with suspension liquid;
[0019] (2) High-pressure water washing: Wash the blind-drilled workpiece after sandblasting with high-pressure water at a pressure of 10 Bar for 10 seconds;
[0020] (3) Micro-etching: use hydrogen peroxide with a mass concentration of 1.5%, heat it to 30°C, and perform spray pressure micro-etching on the blind drilling workpiece; the micro-etching amount is 20 microinches, and the spray pressure is 0.8 kg / cm 2 , the processing time is 40 seconds;
[0021] (4) Composite water washing: The blind drilled workpiece after mic...
Embodiment 2
[0025] Embodiment 2 A method for improving the horizontal pretreatment of exposed copper at the bottom of the hole when the blind drilled workpiece is electroplated with soft gold, the steps are:
[0026] (1) Sand blasting: use deionized water to prepare Al with a mass concentration of 15% 2 o 3 Suspension; under 15Bar pressure, with the configured Al 2 o 3 The suspension of the blind drilling workpiece to be processed is sandblasted for 35 seconds;
[0027] (2) High-pressure water washing: wash the blind-drilled workpiece with a pressure of 15 Bar for 15 seconds;
[0028] (3) Micro-etching: Use hydrogen peroxide with a mass concentration of 2.5% and heat it to 35°C to perform spray pressure micro-etching on the blind drilled workpiece; the micro-etching amount is 30 microinches, and the spray pressure is 1.0 kg / cm 2 , the processing time is 35 seconds;
[0029] (4) Composite water washing: The blind drilled workpiece after micro-etching is subjected to composite water wa...
Embodiment 3
[0033] Embodiment 3 A method for improving the horizontal pretreatment of exposed copper at the bottom of the hole when the blind drilled workpiece is electroplated with soft gold, the steps are:
[0034] (1) Sand blasting: use deionized water to prepare Al with a mass concentration of 20% 2 o 3 Suspension; under 20Bar pressure, with the configured Al 2 o 3 The suspension of the blind drilling workpiece to be processed is sandblasted for 30 seconds;
[0035] (2) High-pressure water washing: Wash the blind-drilled workpiece after sandblasting for 10 seconds with high-pressure water at a pressure of 20 Bar;
[0036] (3) Micro-etching: Use hydrogen peroxide with a mass concentration of 3.5% and heat it to 35°C to perform spray pressure micro-etching on the blind drilled workpiece; the micro-etching amount is 40 microinches, and the spray pressure is 1.2 kg / cm 2 , the processing time is 30 seconds;
[0037] (4) Composite water washing: The blind drilled workpiece after micro-...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More