Method for installing steel cofferdam by the aid of pier supporting frame

A steel cofferdam and support frame technology, applied in the direction of construction and infrastructure engineering, can solve the problems that soil cofferdams and soil bag cofferdams cannot meet the requirements of construction, and can not meet the requirements, so as to facilitate quality and safety control, Simplified construction difficulty and good stability

Active Publication Date: 2013-02-20
CCCC ROAD & BRIDGE SPECIAL ENG
View PDF5 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Under complex conditions (small clearance under the bridge, pebble river with high flow velocity), soil cofferdams and soil bag cofferdams cannot meet the construction requirements when using pier maintenance and reconstruction; steel sheet pile cofferdams and reinforced concrete sheet pile cofferdams The sinking of the weir requires a certain clearance height, which also cannot meet the requirements; therefore, steel cofferdams become the first choice
[0004] Steel cofferdams are widely used in new bridge construction projects, and the construction technology is mature. However, when they are used for the maintenance and reconstruction of bridge piers in shallow rapids, the installation of steel cofferdams outside bridge piers is often subject to complex conditions (no large hoisting facilities, small Clearance under the bridge or large flow rate or construction requirements environmental protection) restrictions, need to be improved on the basis of the existing steel cofferdam construction method to achieve

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for installing steel cofferdam by the aid of pier supporting frame
  • Method for installing steel cofferdam by the aid of pier supporting frame
  • Method for installing steel cofferdam by the aid of pier supporting frame

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not limit the present invention.

[0055] A method for installing a steel cofferdam by means of a pier support frame, comprising the steps of:

[0056] 1) Installation of hoisting frame:

[0057] Such as Figure 6 The hoisting frame 5 shown includes a horizontal cantilever beam 5.1, a vertical cantilever beam 5.2 and a flat connecting rod 5.3. Due to insufficient bridge clearance, the hoisting frame is installed on the pier top of the bridge pier 16 in order to make reasonable use of the space. Specifically, the longitudinal cantilever beam 5.2 and the horizontal cantilever beam 5.1 are transported to the bridge pier by a transport ship, and then the longitudinal cantilever beam 5.2 is transported to the bridge pier. Hoisting is placed on the top of the pier, and...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for installing a steel cofferdam by the aid of a pier supporting frame. The method comprises that a lifting frame and a guide frame are installed on a pier, the steel cofferdam is divided into a plurality of steel cofferdam sections according to actual conditions, and each of the steel cofferdam sections is divided into a plurality of steel cofferdam units with chamfer angles. During construction, the lifting frame which is located at the top of the pier or on one side of the pier and is used for lifting the steel cofferdam is installed firstly, the guide frame which is located on one side of the pier and can be used for guiding and positioning the underwater steel cofferdam is installed, finally, steel cofferdam units are lifted horizontally and then adjusted to be vertical, and the steel cofferdam having a self-balancing capability can be formed through lifting and assembly of sections and units by the aid of the lifting frame and the guide frame in such a sequence that upstream steel cofferdam units and downstream steel cofferdam units are installed and then steel cofferdam units in the middle are installed. The method can effectively solve the problems of assembly, positioning and sinking of the steel cofferdam in a narrow and small space on the condition that no large lifting device is provided, and the method has the advantages of being good in adaptability, simple in structure, convenient to manufacture, good in operability, safe, reliable, good in economical efficiency, good in application prospect and the like.

Description

technical field [0001] The invention relates to the field of bridge engineering, in particular to a simple method for installing a steel cofferdam by means of a bridge pier support frame. Background technique [0002] During the maintenance and reconstruction of bridge piers in water, a dry working environment is required, and the common method of forming a dry working environment is to use cofferdams. The types of cofferdams are earth cofferdam, earth bag cofferdam, steel sheet pile cofferdam, reinforced concrete sheet pile cofferdam and steel cofferdam. [0003] Under complex conditions (small clearance under the bridge, pebble river with high flow velocity), soil cofferdams and soil bag cofferdams cannot meet the construction requirements when using pier maintenance and reconstruction; steel sheet pile cofferdams and reinforced concrete sheet pile cofferdams The sinking of the weir requires a certain clearance height, which also cannot meet the requirements; therefore, s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D19/04
Inventor 朱慈祥李少芳武向东马小云郑伟陈新林朱浩孙志栋吴振宇
Owner CCCC ROAD & BRIDGE SPECIAL ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products