Automatic testing method and device for variable pitch backup power supply of wind generation set
A technology of automatic test device and backup power supply, which is applied to power supply testing, motor generator testing and other directions, can solve the problems of lack of variable pitch backup power supply testing process and method, increased risk of unit operation, low work efficiency, etc., and is easy to implement. and promotion, reduce the risk of flying cars, and improve the effect of efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] A method for automatically testing the pitch backup power supply of wind turbines according to the present invention is used to automatically test the pitch backup power supplies of each wind turbine in a wind farm, comprising the following steps:
[0031] (1) Compare the system time with the data of each unit. The data of each unit is the time node (period) when each unit needs to test the pitch backup power supply. Taking the pitch backup power supply as an example, as the battery is used As the time increases, the time node of the test should be shortened accordingly. After comparison, if a certain unit needs to perform a pitch backup power test, a request for a certain unit to be tested will be sent.
[0032] The above time nodes can be set according to the model, performance parameters and maintenance manuals of the pitch backup power supply of each unit in the wind farm.
[0033] (2) According to the test request, obtain the operation safety related data of a cert...
Embodiment 2
[0040] An automatic test device for the pitch backup power supply of wind turbines, which is used to automatically test the pitch backup power supplies of each wind turbine in a wind farm. According to the form of functional module structure, it includes:
[0041] Test request module: compare the system time with the data of each unit. The data of each unit is the time node (period) when each unit needs to perform a pitch backup power test. After comparison, if a certain unit needs to perform a pitch backup For power supply test, send a request for a certain unit to be tested. The above time nodes can be set according to the model, performance parameters and maintenance manuals of the pitch backup power supply of each unit in the wind farm.
[0042] Safety Judgment Module: According to the test request, obtain the operation safety related data of a certain unit, and judge whether the unit is in a safe state. If the unit is in a safe state, an automatic test command will be iss...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com