Temporary communication method and microwave relay-opgw optical fiber communication link between a substation under construction and an established substation or grid node
A technology for substations and nodes, applied in optical fiber transmission, circuit devices, electrical components, etc., can solve the problems affecting the security and reliable operation of the power grid communication network, the interruption of OPGW communication optical fibers, and the limited time for joint commissioning. influence, effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] A method of temporary communication between the substation under construction and the substation that has been built as shown in Figure 1. 1. The terrain near the 220kV Wudian substation in Fuzhou is selected to be relatively high, and there is no barrier between the 220kV Wudian substation under construction. 220kV Linzhong-Shangjing transmission line #39 iron tower with good condition and OPGW optical fiber connection box, 2. Provide SDH digital microwave equipment at both ends of one hop and configure two STM-1 optical interface units. 3. In 220kV Wu The SDH digital microwave equipment antenna and outdoor unit are installed in an unobstructed outdoor high place between the #39 iron tower of the 220kV middle radial line in the Diandian substation. The outdoor unit of the SDH digital microwave equipment is connected to the electrical port of the indoor optical unit of the microwave equipment through a coaxial cable , the optical interface unit of microwave equipment is ...
Embodiment 2
[0023] A microwave relay-OPGW optical fiber communication link, including SDH digital microwave equipment at both ends of a hop and two optical interface units, the SDH digital microwave equipment antenna and outdoor unit of the 110kV Moshi substation in Fuqing under construction are installed on the iron tower of the 110kV Moshi substation At high places (relative commanding heights / grid nodes), the outdoor unit is connected to the indoor optical interface unit through the coaxial cable, and the indoor optical interface unit is connected to the existing SDH optical interface through the optical fiber jumper. The SDH digital microwave equipment antenna and outdoor unit at the other end are installed on the high roof (relative commanding height) of Jingyang power supply station (grid node) in Fuqing City near the 110kV Moshi substation under construction, and the SDH digital microwave equipment outdoor unit on the roof of Jingyang power supply station The coaxial cable is connec...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com