A post-matching and folding technology, which is applied in the direction of earth drilling, mining equipment, tunnels, etc., can solve the problems of unfavorable winter start, large ground occupation, high cost, etc., and achieve small debugging range, small impact, and high disassembly times little effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The specific implementation manner of the present invention will be further described in conjunction with the following engineering examples.
[0021] Project Overview
[0022] The main project contents of the first bid section of the East Main Canal of the supporting project of the South-to-North Water Diversion Project in Beijing include shield tunnels and secondary linings of 3974.39m, 7 exhaust valve wells (No. 1-7), 2 shield tunnel originating and receiving wells, 1 shield receiving shaft, 1 emptying valve shaft and 3 secondary lining construction shafts. According to the design, the length of the 2# shield starting and receiving shaft of this project is 49.6m, the width of the wellhead is 14m, and the width of the supporting trolley shaft is 7.6m (after excavation to 8.5m). After the shield machine started from the 2# launch shaft, it excavated from east to west, and was hoisted out to the 1# shield launch and receiving shaft.
[0023] The project uses the...