The technology of a coring machine and a fender, which is applied in the direction of a sampling device and the like, can solve the problems of hidden dangers of the road coring machine operator, pollution of clothes in the surrounding environment, etc., and achieves a good fouling effect, a practical method, and easy-to-obtain materials. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] The preparation method of the fender involved in the present embodiment comprises the following process steps:
[0024] (1) Choose a steel plate with a thickness of 0.2-0.5 cm to make a cylindrical mudguard 2 with a diameter of 8-25 cm and a hollow structure. The type of coring machine drill, the center of the upper end of the mudguard 2 is formed with a drill hole 1;
[0025] (2) Choose a 0.3-0.8 cm thick steel plate to make a rectangular or square chassis 3, the side length of the chassis 3 is 20-50 cm, and the center of the chassis 3 is hollowed out with a round hole with a diameter of 8-25 cm 4;
[0026] (3) Fix and seal the round hole 4 of the chassis 3 prepared in step (2) with the lower end of the mudguard 2 prepared in step (1), and at the same time ensure that the center axis of the mudguard 2 and the center of the round hole 4 The shafts are on the same vertical axis, so that good mud protection is achieved.
[0027] The main structure of the mudguard prepa...
Embodiment 2
[0030] The preparation method of another kind of fender involved in this embodiment comprises the following process steps:
[0031] (1) Choose a steel plate with a thickness of 0.2-0.5 cm to make a cylindrical mudguard 2 with a diameter of 8-25 cm and a hollow structure. The coring machine drill bit of the model, the center of the upper end of the mudguard 2 is shaped on a drill hole 1, and the lower edge of the mudguard 2 is fixedly welded with 3-6 stoppers 5, the width of the stopper 5 is 3-5 centimeters, and its horizontal The axis is perpendicular to the vertical axis of the mudguard 2;
[0032] (2) Choose a 0.3-0.8 cm thick steel plate to make a circular or elliptical chassis 3, the diameter of the chassis 3 is 20-50 cm, and the center of the chassis 3 is hollowed out with a diameter of 9-26 cm. Round hole 4, the round hole 4 of the chassis 3 prepared in step (2) is socketed on the lower end of the mudguard tube 2 prepared in step (1), that is, the assembly of the mudgua...
Embodiment 3
[0036] The preparation method of another kind of fender involved in this embodiment specifically includes the following process steps:
[0037] (1) Choose a steel plate with a thickness of 0.2-0.5 cm to make a cylindrical mudguard 2 with a diameter of 8-25 cm and a hollow structure. The coring machine drill bit of model is shaped on the drill bit hole 1 at the center of the upper end of the mudguard tube 2, and the lower end edge of the mudguard tube 2 is fixedly welded with an annular retaining ring 6, and the width of the retaining ring 6 is 2-5 centimeters, and its horizontal The axis is perpendicular to the vertical axis of the mudguard 2;
[0038] (2) Choose a 0.3-0.8 cm thick steel plate to make a chassis 3 with a square structure, the side length of the chassis 3 is 20-50 cm, and the center of the chassis 3 is hollowed out to form a round hole 4 with a diameter of 9-26 cm , the round hole 4 of the chassis 3 prepared in step (2) is socketed on the lower end of the mudgu...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| height | aaaaa | aaaaa |
| width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 