A load simulation experiment device for model pile foundation
A technology of load simulation and experimental device, applied in the test of basic structure, basic structure engineering, construction, etc., can solve the problems of complex principle, expensive construction cost, difficult to realize, etc., achieve simple structure principle, adjustable size, reduce The effect of friction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] As shown in the figure, a load simulation experiment device for a model pile foundation includes a model pile foundation 1, a screw jack 2 for applying a vertical load to the model pile foundation 1, and a screw jack 2 for applying a lateral load to the model pile foundation 1. The motor 3, and the loading frame 4 of the integrated structure, the reaction beam 5 and the motor pedestal 6, the motor 3 is arranged on the motor pedestal 6, the model pile foundation 1 is embedded in the soil body of the soil box 7, the screw jack 2 An automatic alignment box 8 is arranged on the top, and the automatic alignment box 8 is suspended on the reaction beam 5 through two longitudinal bearings 9 thereon and can move longitudinally along the reaction beam 5. The upper part of the automatic alignment box 8 is provided with four A lateral bearing 10 for limiting its lateral lateral displacement; the power output by the motor 3 for loading lateral loads to the model pile foundation 1 pas...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 