A technology of Three Gorges Reservoir area and planting holes, which is applied in the fields of land preparation, cultivation, agricultural machinery and implements, etc., can solve the problems of low soil fertility and land productivity, long soil maturation time, and large amount of soil improvement works, etc. The effect of soil maturation time, reduction of soil improvement works, and reduction of construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Example 1, see also figure 1 .
[0029] 1) Planting hole planning: plan the planting hole layout according to the row spacing of 5m and the plant spacing of 4m, and arrange 600-650 planting holes per hectare of citrus orchard.
[0030] 2) Topsoil stripping: For each planned planting hole, take the center of the planting hole as the origin, and carry out an area of 8-10m 2 The topsoil stripped, the topsoil stripped thickness is 20cm, stacked on the spot, and backfilled after the excavation of the planting hole is completed.
[0031] 3) Excavation of planting holes: According to the distribution and morphological characteristics of mature citrus roots, the excavation specifications of planting holes are 1.5m in length, 1.2m in width and 0.8m in depth. Loosen and excavate the lower soil parent material or rock layer by blasting, and replace it with fertile soil or organic fertilizer. Take out the parent material or rock layer that has been fried and loosen and stack i...
Embodiment 2
[0034] 1) Planting hole planning: plan the planting hole layout according to the row spacing of 5.5m and the plant spacing of 4.2m, and arrange 600-650 planting holes per hectare of citrus orchard.
[0035] 2) Topsoil stripping: For each planned planting hole, take the center of the planting hole as the origin, and carry out an area of 8-10m 2 The topsoil is stripped, and the thickness of the stripped topsoil is 18cm, and it is piled up on the spot, and it will be backfilled after the excavation of the planting hole is completed.
[0036] 3) Excavation of the planting hole: the excavation specification of the planting hole is 1.6m in length, 1.2m in width and 0.7m in depth. Loosen and excavate the lower soil parent material or rock layer by blasting, and replace it with fertile soil or organic fertilizer. Take out the parent material or rock layer that has been fried and loosen and stack it nearby (separate from the topsoil). Take out the large rocks that are not easy to we...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com