Cutoff measure cooperated power flow monitoring method of electromagnetic ring network
An electromagnetic ring network and cutting machine technology, applied in the direction of parallel feeding arrangement of a single network, can solve the problems of power grid blackout, lack of effective monitoring, low-voltage line overcurrent, etc., to ensure safe operation, simple and easy programming, The effect of reducing work intensity and stress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0042] Embodiment: A method for monitoring the power flow of an electromagnetic ring network under the measures of coordinating machine cut-offs, comprising the following steps:
[0043] (1-1) According to the historical operation of the high and low voltage electromagnetic ring network to be monitored, analyze and determine the high voltage line L that needs to be monitored in the high and low voltage electromagnetic ring network h and low voltage line L L ;
[0044] (1-2) Introducing the conventional distribution coefficient method to monitor the high and low voltage electromagnetic ring network, the power flow control formula of the conventional distribution coefficient method is:
[0045] L 1 +a*L 2 ≤Lmax1 (1)
[0046] In the formula: a is the distribution coefficient, which is a constant during scheduling and monitoring, L 1为 The power flow value of the low voltage line, L 2为 The flow value of the high-voltage line, Lmax1 is the stability limit of the low-voltage li...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 