technical field
[0001] The invention is used in the field of tunnel construction, and in particular relates to a shield synchronous grouting construction method and construction materials. Background technique
[0002] During the construction of the shield tunnel, when the shield tail comes out of the assembled shield segment, it will inevitably cause a building gap between the segment lining and the soil. At this time, timely shield tail grouting is required to prevent The soil around the shield segment is loosened, and at the same time, the wrapping effect of the soil on the lining structure of the shield segment is strengthened, so as to avoid the phenomenon of local stress concentration in the segment structure due to the lack of necessary resistance. Shield tail grouting refers to that in the process of shield tunneling construction, after the tunnel lining segments are assembled and the tunnel comes out of the shield tail, under a certain grouting pressure, an appropri...