Polymer film self-adhesive waterproof roll material and preparation method thereof
A self-adhesive waterproof membrane and polymer glue technology, which is applied in chemical instruments and methods, layered products, lamination devices, etc., can solve the problem that the waterproof membrane is not resistant to high temperature, has a small scope of application, and cannot meet the needs of the waterproof membrane. and other problems, to achieve the effect of good waterproof performance, excellent low temperature and heat resistance, and high tensile strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] a. Preparation of asphalt layer: take 1.5 tons of 100 # Bitumen and 0.6 tons of 10 # After asphalt is mixed, heat up to 190°C, add 0.3 tons of SBS to oxidize for 1 hour, put it in a colloid mill for grinding for 1 hour, cool down to 170°C, then add 0.15 tons of SBR for oxidation for 1 hour, and put it in a colloid mill for grinding for 1 hour again. Then add 0.15 tons of hydrogenated petroleum resin to oxidize for 1 hour, raise the temperature to 180°C, then add 1 ton of stone powder, stir for 1 hour, and cool down to 120°C to obtain the prepared asphalt layer;
[0018] b. Evenly cover the asphalt layer prepared above on the film.
Embodiment 2
[0020] a. Preparation of asphalt layer: take 2.5 tons of 100 # bitumen and 0.1 ton 10 # After the asphalt is mixed, heat up to 195°C, add 0.1 tons of SBS to oxidize for 1.5 hours, put it in a colloid mill for 0.5 hours, cool down to 175°C, then add 0.05 tons of SBR to oxidize for 0.5 hours, and place it in a colloid mill for 1.5 hours to grind again. Then add 0.25 tons of hydrogenated petroleum resin to oxidize for 0.5 hours, heat up to 175°C, then add 0.1 tons of stone powder, stir for 1.5 hours, cool down to 115°C to obtain the prepared asphalt layer;
[0021] b. Evenly cover the asphalt layer prepared above on the film.
Embodiment 3
[0023] a. Preparation of asphalt layer: take 0.5 tons of 100 # asphalt and 1.2 tons of 10 # After the asphalt is mixed, heat up to 185°C, add 0.6 tons of SBS to oxidize for 0.5 hours, put it in a colloid mill for grinding for 1.5 hours, cool down to 165°C, then add 0.25 tons of SBR to oxidize for 1.5 hours, and put it in a colloid mill for 0.5 hours of grinding again. Then add 0.05 tons of hydrogenated petroleum resin to oxidize for 1.5 hours, heat up to 185°C, then add 2 tons of stone powder, stir for 0.5 hours, cool down to 125°C to obtain the prepared asphalt layer;
[0024] b. Evenly cover the asphalt layer prepared above on the film.