Construction method for electric network management automation training system
A technology for grid scheduling and construction methods, which is used in teaching models, instruments, educational appliances, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] Below in conjunction with accompanying drawing and embodiment the present invention is described in detail:
[0023] The construction method of the power grid dispatching automation training system of this embodiment includes the following steps:
[0024] ①Choose the decommissioned OPEN3000 system and carry out hardware transformation: firstly, one of the original WEB servers, mirror server, DTS server and teaching and student Workstation, front-end switch, terminal server, switch in zone II, and firewalls in zone I and II are removed, and then a PC is used as the OPEN3000 system simulator workstation, and the serial port of the PC is connected to OPEN3000 system front-end A and OPEN3000 The front-end B of the system is directly connected to realize the serial port communication, and the internal boundary switch in Zone II in the original OPEN3000 system acts as the boundary switch.
[0025] ②Adjustment and modification of the software part: first, modify the node info...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com