Embodiment 1
[0053] like figure 1 As shown, it is the quick-installed circular tube base station tower described in the first embodiment, including: tower body 1, antenna bracket 2, platform 5 and lightning rod 3, wherein,
[0054] The transverse cross-section of the tower body 1 is circular, the tower body 1 is conical and cylindrical from top to bottom, and the taper of the tower body 1 is 0.1.
[0055] The tower body 1 includes: at least 4 successively connected tower columns and ladders 11, wherein,
[0056] Including at least 3 towers with the same height, the height of the towers arranged at the bottom of the tower body 1 is 2 to 9 meters, and the inner flange 4 is passed between each section of the towers connected.
[0057] The tower body 1 of the present embodiment is set as 4-section tower columns, the overall height of the tower body 1 is 25 meters, and the height of the three-section tower columns is 7 meters. The height of the column is 4 meters; In addition, the tower body...
Embodiment 2
[0065] like figure 1 As shown, it is a quick-installed circular tube base station tower described in Embodiment 2, based on Embodiment 1:
[0066] The first flange 401 and the second flange 402 are snapped together by a regular polygonal concave-convex groove structure, wherein,
[0067] Specifically, as Figure 4 As shown, on the body of the second flange 402 and near the through hole of the second flange 402, a regular polygonal groove 404 matching the through hole is provided, and the After the protrusion 403 on the first flange 401 is engaged with the groove 404 on the second flange 402, the first flange 401 and the second flange 402 will not be arbitrarily The rotation of the two towers can be stably and firmly connected together, which is conducive to further operation and can realize the rapid installation of the tower body.
[0068] Preferably, as figure 2 As shown, on the outer sidewall of the regular polygonal protrusion 403, there are at least two retractable p...
Embodiment 3
[0079] like figure 1 As shown, it is a quick-installed circular tube base station tower described in Embodiment 3, based on Embodiment 1:
[0080] like figure 2As shown, the number of sides of the regular polygonal through holes of the first flange 401 and the second flange 402 can be 5, 10, or 16; The disc body of the first flange 401 and the second flange 402 at the top of the tower body is smaller than the disc body of the first flange 401 and the second flange 402 arranged at the bottom of the tower body, which can be The regular polygonal through-holes of the first flange 401 and the second flange 402 arranged on the top of the tower body are set to 16 polygons, which can increase the area of the through-holes and facilitate maintenance personnel to enter; The regular polygonal through-holes of the first flange 401 and the second flange 402 at the bottom of the body are set as pentagons to reinforce the fixing of the plate and prevent the tower from tilting. The reg...