Temporary plugging and workover fluid for gas wells in low-pressure sandstone reservoirs and its preparation method

A preparation method and technology of workover fluid, applied in wellbore/well components, chemical instruments and methods, earthwork drilling and production, etc., can solve problems such as easy hydrate formation, dissolution, recrystallization, etc., to avoid water lock damage, The formation compatibility is good and the friction coefficient is reduced

Active Publication Date: 2017-10-17
PETROCHINA CO LTD
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The disadvantage is that the workover operation time is long, and the contact time between the formation and the fluid is long, especially for low-porosity and low-permeability gas reservoirs, the degree of water lock damage will still be serious
The workover fluid with solid phase and no clay phase temporary plugging type adds soluble temporary plugging materials to the workover fluid, which can quickly form temporary plugging on the surface of the hole or fracture, and control the leakage of the workover fluid. The disadvantage is that it is suitable for low permeability Improper treatment of the gas layer and the plugging solution can easily cause damage to the reservoir, and at the same time, the solid phase particles will crystallize, dissolve, and recrystallize due to temperature changes, making the temporary plugging effect unsatisfactory
However, the killing fluid still has the following disadvantages: (1) A certain amount of free water will be generated under the pressure, which will cause damage to the formation; (2) It is prone to hydrolysis when encountering divalent cations, and cannot form effective temporary plugging; (3) In winter During construction, it is easy to generate hydrate, which will cause ice blockage in the wellbore or pipeline, and affect normal operation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0026] Formula 1: a temporary plugging and workover fluid for gas wells in low-pressure sandstone reservoirs, which is composed of the following components accounting for the volume percentage of the wellbore: alcohol-based temporary plugging and workover fluid 10%, oil-based spacer fluid 0.5%, high-efficiency clay stabilizer 89.5% %; Among them, the alcohol-based temporary plugging and workover fluid is composed of the following materials in mass percentage: 0.5% water-absorbing polymer, 1% temporary plugging fiber, 0.5% fiber dispersant, 50% water, and the rest is ethylene glycol, of which temporary plugging The plugging fiber is organic fiber aramid fiber, glass fiber and carbon fiber in the inorganic fiber are mixed according to the mass of 1:1:1, and the fiber dispersant is composed of 5% ester quaternary ammonium salt and 95% of the total mass of the fiber dispersant It is compounded with water; the high-efficiency clay stabilizer is composed of the following materials in...

Embodiment 2

[0032] On the basis of Example 1, the construction process of the present invention includes three slugs. According to the order of entering the well, the first slug is an alcohol-based temporary plugging and workover fluid, and the second slug is an oil-based spacer fluid, which is used to prevent up and down The two layers of slugs are miscible, and the third slug is a high-efficiency clay stabilizer, which prevents the clay from swelling.

[0033]1) Synthesize the first slug alcohol-based temporary plugging and workover fluid. The alcohol-based temporary plugging and workover fluid accounts for 10% of the wellbore volume. Add water accounting for 50% of the total mass to the liquid mixing tank with agitator. It depends on the location of the reservoir and the structure of the well body; then slowly add 0.5% water-absorbing polymer, and stir while adding; after 30 minutes, the water-absorbing polymer is completely absorbed and stable, use a filter to remove free water, and th...

Embodiment 3

[0039] According to the specification of production casing of Well A: N80, Φ177.8×9.19mm, casing depth 2450m; tubing specification: N80, Φ114.3×7.37mm; Formation pressure coefficient and wellbore structure, calculation of required workover fluid density and dosage, and workover fluid synthesis and workover operations.

[0040] 1) Prepare 5 m with stirrer 3 Clean the liquid distribution tank;

[0041] 2) First add 1.5m to the liquid distribution tank 3 Add 15kg of water-absorbing polymer to clean water, and stir while adding. After 30 minutes, the water-absorbing polymer is completely absorbed and stable. Use a filter to remove free water, and then add 15kg of fiber dispersant and 30kg of temporary blocking fiber to mix evenly before adding, Simultaneously slowly inject 1.5m 3 ethylene glycol, stirred synchronously for 30 minutes to a homogeneous liquid, and placed for later use;

[0042] 3) According to the wellbore volume, prepare 0.2m 3 white oil;

[0043] 4) Add 25m t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
lengthaaaaaaaaaa
tensile strengthaaaaaaaaaa
densityaaaaaaaaaa
Login to view more

Abstract

The invention belongs to the technical field of downhole operations in oil and gas fields, and in particular relates to a temporary plugging and workover fluid for gas wells in low-pressure sandstone reservoirs and a preparation method. %, oil-based spacer fluid 0.5~1%, high-efficiency clay stabilizer 79~89.5%; alcohol-based temporary plugging and workover fluid is composed of the following materials by mass: 0.5~1% water-absorbing polymer, 1~2% temporary plugging Fiber, 0.5~1% fiber dispersant, 45~50% water, and the rest are alcohol; high-efficiency clay stabilizer is composed of materials in the following mass percentages: 0.6~1% clay stabilizer and 99~99.4% water. The invention can effectively temporarily plug the porous sandstone reservoir during workover operation, reduce the damage of the workover fluid to the formation, and has the characteristics of good salt resistance, no hydrate blockage, convenient construction, safety and environmental protection.

Description

technical field [0001] The invention belongs to the technical field of downhole operation in oil and gas fields. Specifically, it relates to a temporary plugging and workover fluid for gas wells in low-pressure sandstone reservoirs and a preparation method thereof, which is mainly used for temporarily plugging and killing porous sandstones during well workover, so as to reduce the damage of the workover fluid to formations. Background technique [0002] For porous low-pressure sandstone gas reservoirs, the permeability is low, and such gas wells need to be stimulated by fracturing to achieve industrial productivity. During the workover operation, the workover fluid will enter the deep part of the reservoir along the fracture surface, so improper selection of workover fluid will cause damage to the water lock of the reservoir around the fracture. In the development and workover process of low-pressure gas fields at home and abroad, clay-free water-based workover fluids are g...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): C09K8/12C09K8/508E21B33/13
Inventor 李慧李琼玮奚运涛孙雨来李明星朱方辉张振云
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products