Method for carrying out tower site foundation pit construction on karst landform foundation in rainy season
Patent Information
- Authority / Receiving Office
- CN ยท China
- Current Assignee / Owner
- STATE GRID CORP OF CHINA
- Publication Date
- 2015-07-15
Abstract
Description
technical field
[0001] The invention relates to a method for constructing a tower foundation pit in a rainy season of a karst landform foundation. Background technique
[0002] The Guangdong ยฑ800kV direct current transmission line project of Nuozhadu Power Station 14 bids starts from Luqi Village (D193), Matou Town, Wuming County, and ends at Mo Village (J401), Donglong Town, Qintang District, Guigang. The length of the line is 95.8km, and 187 new iron towers are built, including 34 strain towers and 153 straight towers. The route passes through Matou Town, Wuming County, Xiangxian Town, Shanglin County, Xinxu Town, Zouxu Town, Yangqiao Town, Heji Town, Binyang County, Zhangmu Township, Menggong Township, Shanbei Township, Qintang District, Guigang City Township, Donglong Town. The tower foundation adopts slab type straight column foundation (31 foundations), excavated foundation (146 foundations), and rock embedded foundation (10 foundations). According to the summary st...