Mounting structure and method of stone curtain wall on PC plate
A stone curtain wall and installation structure technology, which is applied to the processing of building materials, walls, building components, etc., can solve the problems of waste of building materials, laborious and time-consuming installation, etc., and achieve the effect of reducing project cost, reducing adjustment workload, and improving flatness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Embodiment 1: as image 3 Or as shown in 4, an installation structure of a stone curtain wall on a PC board 1, which includes at least one beam 4 and at least one hook assembly.
[0033] like figure 1 , figure 2 As shown, the beams 4 are arranged in parallel and installed on the PC board 1 (prefabricated concrete board).
[0034] Wherein, at least one internally threaded tube 2 is preset on the PC board 1 , and each internally threaded tube 2 is provided with a bolt 3 , and the beam 4 is fixed on the PC board 1 through the bolt 3 and the square tube. At least one built-in steel bar 10 is arranged in the PC board 1 .
[0035] Alternatively, the crossbeams 4 are installed on the PC board 1 in a cross arrangement, and all the crossbeams 4 are made of square tubes. The square tube is a steel square tube of 40*20*4cm. The internally threaded pipes are vertically installed in the PC board, the internally threaded pipes are equidistantly arranged, and the nozzles thereof...
Embodiment 2
[0043] Embodiment 2: Compared with Embodiment 1, Embodiment 2 has the following differences.
[0044] The first hook 6 is provided with a slot and a first mounting plate connected to the slot, the notch of the slot is vertically upward, and the first hook 6 is fixed on the crossbeam 4 by the first mounting plate; A hook 6 can be a reverse h-shaped hook or other shapes, but is not limited to a specific shape.
[0045] The second hook 7 is provided with a plug-in board and a second mounting plate connected to the plug-in board, the second hook 7 is connected to the stone plate 9 through the second mounting board, and the second hook 7 is connected to the stone board 9 through the plug The board is hooked on the slot of the first hook 6 .
[0046] The second hanging piece 7 can be a Z-shaped hanging piece, or a U-shaped hanging piece, in short, it is not limited to a specific shape.
Embodiment 3
[0047] Example 3, such as Figure 1 to Figure 5 Shown, a kind of installation method that realizes the stone curtain wall described in claim 1 on PC board, it comprises the following steps.
[0048] S01: At least one internally threaded pipe 2 is preset on the PC board 1, and the internally threaded pipes 2 are equidistantly arranged.
[0049] S02: Correspondingly install the beam 4 on the PC board 1 through the bolt 3, and the bolt 3 is correspondingly installed in the internal threaded pipe 2.
[0050] S03: Install the first hook 6 on the beam 4 .
[0051] S04: Assemble the second hook 7 with the stone board 9 , install the bolt head of a back bolt 8 into the stone board 9 , and fix the second hook 7 to the screw rod of the back bolt 8 .
[0052] S05: Hook the second hook 7 assembled with the stone board 9 onto the first hook 6 .
[0053] In steps S03 and S04, the first hook 6 is provided with a vertically upward plug-in board and a first mounting plate connected to the p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com