[0042] The preparation method of the above coating includes the following steps:
[0043] Step S110, the substrate is cleaned by ultrasonic wave and the surface moisture is removed.
[0044] Of course, if the surface of the substrate is clean and dry, step S110 can be omitted.
[0045] Step S120: Fix the pretreated substrate uniformly on the support and install it into the arc ion plating machine, and pump the furnace chamber to a background vacuum below 0.01 Pa, while turning on the heater to raise the temperature to 300-550°C.
[0046] Step S130: Glow cleaning is performed on the surface of the substrate.
[0047] Preferably, during glow cleaning, open the Ar flow valve and let in Ar gas, adjust the vacuum chamber to about 0.01-1 Pa, add a negative bias voltage of 300-1000V to the substrate, and perform glow sputtering cleaning on the substrate for 5 to 35 minutes;
[0048] Step S140, depositing a Cr interface implant layer and a CrN bonding layer on the surface of the substrate.
[004...
Embodiment 1
[0059] The coating preparation method applied in high-speed milling of hardened steel molds includes the following steps:
[0060] (1) Tool pretreatment: The tool is cleaned by ultrasonic cleaning with metal cleaning solution for 10 minutes, rinsed with deionized water for 5 minutes, dried and clean compressed air is used to dry the surface moisture, dried in a constant temperature oven for 5 minutes, and the tool is a cemented carbide end mill (Φ6mm) );
[0061] (2) Entering the furnace: uniformly fix the pretreated substrate on the support and load it into the arc ion coating machine, pump the furnace chamber to a background vacuum below 0.003 Pa, and turn on the heater to heat up to 450°C;
[0062] (3) Glow cleaning: Enter the Ar gas flow valve, adjust the vacuum chamber to about 0.03 Pa, add a negative bias voltage of 700V to the substrate, and perform glow sputtering cleaning on the substrate for 15 minutes;
[0063] (4) Depositing Cr interface implant layer and CrN bonding layer...
Embodiment 2
[0069] The preparation method of the coating includes the following steps:
[0070] (1) Sample pretreatment: The tool is cleaned by ultrasonic cleaning with metal cleaning solution for 10 minutes, rinsed with deionized water for 5 minutes, dried and clean compressed air is used to dry the surface moisture, dried in a constant temperature oven for 3 minutes, and the tool is a high-speed steel disc (Φ25mm x5mm) );
[0071] (2) Entering the furnace: uniformly fix the pretreated substrate on the bracket and load it into the arc ion coating machine, pump the furnace chamber to a background vacuum below 0.003 Pa, and turn on the heater to raise the temperature to 350°C;
[0072] (3) Glow cleaning: Open the Ar flow valve and let in Ar gas, adjust the vacuum chamber to about 0.03Pa, add a negative bias voltage of 700V to the substrate, and clean the substrate by glow sputtering for 15 minutes;
[0073] (4) Depositing Cr interface implant layer and CrN bonding layer: adjust the negative bias v...
PUM
| Property | Measurement | Unit |
|---|---|---|
| hardness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 