Auxiliary apparatus and method for fast testing DC resistance of large power transformer

A power transformer and DC resistance technology, which is applied in the field of fast test auxiliary devices for large power transformer DC resistance, can solve problems ranging from dozens of minutes to one or two hours, expensive instruments, and inability to open them. Effects of changing test sequence, reducing charging time, and reducing test error

Inactive Publication Date: 2015-12-16
STATE GRID SHANDONG ELECTRIC POWER COMPANY RIZHAOPOWER SUPPLY +1
View PDF5 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the continuous increase of the capacity of the national grid, more and more large-capacity power transformers are connected to the grid, and the parameter testing work before the field transformer is put into operation is becoming more and more heavy, especially for large-capacity power transmission and transformation above 500kV. The DC resistance parameter test of a large power transformer, because its low-voltage side is connected in a delta manner, the windings cannot be opened, and the test time for measuring the DC resistance with constant current charging is very long, ranging from tens of minutes to a long time. Therefore, people use the method of increasing the test current and the capacity of the tester to speed up the test speed. The current is increased from 20A to 100A. The test speed is indeed improved, but it is found that increasing the charging current will cause remanence in the iron core of the transformer. And the greater the charging current, the greater the residual magnetism of the iron core, and the influence of the residual magnetism of the transformer will cause the closing protection
Another method is to use the high-voltage magnetism test method, which is to connect the winding on the high-voltage side to the low-voltage side in series, and magnetize the iron core through the winding on the high-voltage side, so that the iron core can reach magnetic saturation quickly, and improve the DC of the low-voltage side winding. The purpose of resistance test speed, but the instrument with this function is very expensive, and the high-voltage side line must be connected when using it, so it cannot be operated when there is no crane or lifting platform on site, so find an instrument on site that can both It is very urgent to have a more convenient method for on-site wiring with a small current and to increase the test speed.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Auxiliary apparatus and method for fast testing DC resistance of large power transformer
  • Auxiliary apparatus and method for fast testing DC resistance of large power transformer
  • Auxiliary apparatus and method for fast testing DC resistance of large power transformer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] Embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0019] see figure 1 , a kind of large-scale power transformer DC resistance fast test auxiliary device provided by the present invention is used to realize the above-mentioned large-scale power transformer DC resistance fast test method, including A, B, C, O ports, U+, U-, I+, I- Input port, button switch selection module, single-chip microcomputer control module, relay switching module, DC resistance tester port, liquid crystal display module and 232 communication port.

[0020] The A, B, and C ports are respectively connected to the a terminal, the b terminal, and the c terminal, and the U+, U-, I+, and I- input ports are respectively connected to the U+, U-, I+, and I- output ports of the DC resistance tester.

[0021] Based on the test method of the above-mentioned large-scale power transformer DC resistance fast test auxiliary device, the high vo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an auxiliary apparatus and method for fast testing the DC resistance of a large power transformer. The DC resistance testing is successively performed on an ab winding, an ac winding, and a bc winding. A test wire is not required to be changed in a test process such that test time is shortened and a test error possibly due to wire connection and disconnection is reduced. Two phases have same magnetic field direction and one phase has different magnetic field direction before and after wires are replaced such that the test time is shortened to a certain extent. The magnetomotive force generated on windings by the residual magnetism of a transformer is effectively eliminated and utilized by a short circuit manner. Thus, fast and simple demagnetization is achieved and residual magnetism with the direction the same as that in the next measurement is reserved. Thus, the charging time of the testing of the next winding is shortened and testing speed can be increased by low current. Single-chip microcomputer logic controls a relay to intelligently switch test terminals so as to change a test sequence.

Description

technical field [0001] The invention relates to a large-scale power transformer DC resistance quick test auxiliary device and a test method thereof. Background technique [0002] With the continuous increase of the capacity of the national grid, more and more large-capacity power transformers are connected to the grid, and the parameter testing work before the field transformer is put into operation is becoming more and more heavy, especially for large-capacity power transmission and transformation above 500kV. The DC resistance parameter test of a large power transformer, because its low-voltage side is connected in a delta manner, the windings cannot be opened, and the test time for measuring the DC resistance with constant current charging is very long, ranging from tens of minutes to a long time. Therefore, people use the method of increasing the test current and the capacity of the tester to speed up the test speed. The current is increased from 20A to 100A. The test sp...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01R27/02
Inventor 许允都孙安青宋珂朱晓冬栾琦马德龙