Blast Furnace Stave Pressure Test Quick Connector and Its Application Method
A technology of cooling wall and pressure test, applied in cooling devices, inspection devices, etc., can solve the problems of delaying the progress of cooling wall installation, low pressure test effect and efficiency, difficulty in carrying out pressure test work, etc., so as to speed up the construction progress and shorten the Pressure test time, easy processing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Quick couplings for blast furnace stave pressure test
[0037] see now Figure 1 ~ Figure 3 , figure 1 It is a schematic diagram of the joint of the embodiment of the present invention; figure 2 It is a cross-sectional view of quick joint A-A for blast furnace stave pressure test according to the embodiment of the present invention; image 3 It is a B-B sectional view of the quick connector of the embodiment of the present invention. As shown in the figure, the casing 1 is made of φ54×3mm steel pipe, which is in a cylindrical shape, and four φ8mm fixing bolt holes are evenly arranged in the lower part along the circumference, and a threaded thread is turned in the hole with a lathe; Pull out the threaded buckle within a length of 1.5cm;
[0038] The pipe cap 2 is made of φ60×4mm steel pipe and steel plate, in the shape of a nut, with a threaded buckle inside, and one end is welded with a 3mm thick circular steel plate. The diameter of the inner hole of the circular...
Embodiment 2
[0046] How to use quick connectors for blast furnace stave pressure test
[0047] The method for using the quick connector for blast furnace stave pressure test is characterized in that it comprises the following steps:
[0048] a. Clean up the dust and oil stains on the stave water pipe 9, and use a grinder to smooth the burrs and flashes of the nozzle;
[0049] b. Insert the connecting piece 3, the crimping sleeve 4 and the rubber hose 5 into the cap 2, so that the connecting piece plate is in flat contact with the cap 2, and the other end of the rubber hose 5 is connected to the pressure test pump.
[0050] c. Insert a rubber gasket 6 between the disc of the connector in the pipe cap and the end of the blast furnace stave water pipe to be pressure tested;
[0051] d. Put the lining ring 7 into the casing 1, and make one end of the U-shaped groove in front;
[0052] e. Rotate the casing 1 and the inner lining ring 7 into the cap 2, and it is advisable to lightly contact on...