Drill bit for construction of bored pile and construction method using the same

A technique for drilling cast-in-situ piles and drill bits, which is applied in the direction of drill bits, drilling tools, and sheet pile walls, etc., which can solve the problems of increasing construction costs, troublesome and laborious replacement processes, and burying drill bits, so as to prolong the service life and save time and cost , The effect of rapid construction process

Active Publication Date: 2018-02-06
浙江易通特种基础工程股份有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] However, although sinking into the casing is beneficial for drilling, within the height range of the casing, this part of the sandy soil body between the casing and the pile hole may still collapse, and there is still sediment, which buries the drill bit and drill pipe, and cannot be drilled smoothly. A series of problems such as lowering the reinforcement cage and affecting the quality of the pile body, etc., in order to completely eradicate the above-mentioned disadvantages, someone put forward the technical idea of ​​using drill bits of two sizes, one large and one small, that is, first use the large drill bit to drill the diameter of the casing at the height of the casing. Use a small drill bit to drill a large hole with the same inner diameter as the designed diameter of the bored pile
Yet the actual operability of above-mentioned assumption is not strong, and this is because two kinds of drill bits need to be prepared for each construction, which increases the construction cost, and the drill bit needs to be mentioned outside the hole every time, and then the whole drill bit is removed from the drilling rig. After unscrewing and replacing a new drill bit, the overall weight of the drill bit itself is not light, and it is even heavier after being stuck with mud, which makes the replacement process troublesome and laborious, which is very inconvenient and further delays the work process. Therefore, no matter from the perspective of time cost and economic cost, All gains outweigh the losses
Moreover, there is also a defect in this technical solution. Although the protection of the reinforcement block has avoided the wear of the retaining ring, the constant friction between the reinforcement block and the hole wall soil will also be worn. Once the reinforcement block is worn and scrapped, it can only be Cutting it off and then welding a new reinforcement block is a troublesome and laborious process, and repeated welding will cause great damage to the retaining ring

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Drill bit for construction of bored pile and construction method using the same
  • Drill bit for construction of bored pile and construction method using the same
  • Drill bit for construction of bored pile and construction method using the same

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The present invention will be further described below in conjunction with the drawings and specific embodiments.

[0033] Such as figure 2 , image 3 , Figure 4 , Figure 5 As shown, the drill bit used for the construction of bored piles of the present invention includes a hollow base rod 1, a drill tip 2, a retaining ring 3, a plurality of connecting plates 4, and scrapers 5 with the same number of connecting plates 4. In this embodiment, there are three connecting plates 4 and three scrapers 5.

[0034] The top end of the base rod 1 is provided with a connecting part 6; specifically, the drill rod of the drilling rig is provided with a male buckle and the base rod 1 of the drill bit is provided with a female buckle.

[0035] The inner ends of the three connecting plates 4 are all welded to the base rod 1 and are evenly distributed along the circumference of the base rod 1, and the outer ends of the three connecting plates 4 are all welded to the inner circumferential surf...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a drill bit for constructing bored piles and a construction method using the drill bit. The drill bit is provided with a mud scraping assembly and a detachable rib protecting block. The mud scraping assembly comprises a mud scraping plate (8) and installing plates (9), and the installing plates (9) are welded to the circumferential face of the inner circle of a block ring (3). A steel brush (17) is arranged on the outer side of the mud scraping plate (8). The mud scraping plate (8) is hung on the block ring (3) through a first clamping groove (10). An installing part (8.1) of the mud scraping plate (8) is located between the two installing plates (9) of the same set, and the installing part (8.1) of the mud scraping plate (8) and the installing plates (9) on the two sides are fixed in a threaded connection mode. The method is characterized in that in the drilling process, the mud scraping plate (8) is firstly installed on the block ring (3) so that a large hole with the size matched with that of a pile casing can be drilled, then the mud scraping plate (8) is taken down, and the rib protective block is installed so that a small hole with the size matched with the designed size of the bored piles can be drilled. By means of the drill bit and the construction method, sand soil between the pile casing and the pile holes can be effectively removed in a drilling mode.

Description

Technical field [0001] The invention relates to the field of pile foundation construction, in particular to a drill bit for constructing bored piles and a construction method using the drill bit. Background technique [0002] Because of the advantages of high bearing capacity, strong adaptability, pile length up to 100 meters, which reduces the number of piles, concrete bored piles have become domestic and foreign constructions (structures), especially large-scale constructions (structures) such as bridges, The preferred basic form of oil tanks, LNG tanks, and nuclear power plants. The main construction process of concrete bored piles are: forming holes, lowering the steel cage, and pouring concrete. In the above-mentioned main construction process, hole formation is the key link. In the process of hole formation, a three-wing scraper bit is usually used to drill into the formation. [0003] Such as figure 1 As shown, the prior art three-wing scraper drill bit includes a hollow ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21B10/62E21B12/06E02D5/38
Inventor 樊敬亮徐新战陈保德何文强王喜叶兴友夏克玲沈海姣
Owner 浙江易通特种基础工程股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products