Unlock instant, AI-driven research and patent intelligence for your innovation.

Multi-level reinforcement method for gob-side entry retention in high stress and strong disturbance coal seam

A high-stress, empty entry retaining technology, used in earth-moving drilling, shaft equipment, wellbore lining, etc., can solve the problems of threatening the safe recovery of the protective layer, the difficulty of pre-cracking of the roof, and the large bearing capacity of the backfill wall. The effect of pressure capacity, fast speed and easy construction

Active Publication Date: 2018-12-18
PINGDINGSHAN TIANAN COAL MINING +2
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] For the mining of high ground stress, thick hard roof, and direct overlying close-distance coal seam group, due to the wide "three zones" of the hard roof working face, the mining is strong, the roof pre-cracking is dangerous and difficult, and the side long overhang of the goaf causes high additional stress. , the filling wall bears a large load, is difficult to maintain, and a large number of pressure-relieving gas from adjacent layers pours into the goaf of the protective layer, threatening the safety of the protective layer. At present, there is no coal pillar-free goaf retention under such conditions in China. Therefore, it is of great significance to conduct research on the technology of gob-side entry retention without coal pillars under such conditions

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-level reinforcement method for gob-side entry retention in high stress and strong disturbance coal seam
  • Multi-level reinforcement method for gob-side entry retention in high stress and strong disturbance coal seam
  • Multi-level reinforcement method for gob-side entry retention in high stress and strong disturbance coal seam

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] Below with reference to accompanying drawing and in conjunction with example the specific embodiment of the present invention is described in further detail:

[0032] The multi-stage reinforcement method for gob-side entry retention in high-stress and strongly disturbed coal seams of the present invention comprises the following steps:

[0033] 1) Firstly, the gob entry 1 is reinforced before mining, and anchor rods 2 with a row spacing of L1=400mm-700mm are arranged on the roof of gob entry entry 1, and the anchor rods 2 in each row and column are matched with steel Band 3, forming a roof support net, such as figure 2 and image 3 shown;

[0034] 2) Open a gap on the coal wall on the side of the gob-side entry retention 1 at about 6m in advance to form the filling area 4, and then construct the anchor rod 2 on the roof of the filling area 4, and the anchor on the top plate of the gob-side entry retention 1 Rods 2 are arranged in a staggered manner, and the row spac...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a high stress strong disturbance coal seam gob-side entry retaining multistage reinforcing method, and specially is suitable for reinforcement of goaf gob-side entry retaining in large mining depth, complex top board and close range high gas seam group exploitation; the method aims at gob-side entry retaining surrounding rocks stress distribution and damage characteristics in each phase; gob-side entry retaining and filling area top board reinforcement, construction filling wall reinforcement, and lane auxiliary reinforcement support and anaphase sealing are carried out, so the gob-side entry retaining can satisfy ventilation, pedestrian safety production and next working face back production needs after final deformation, thus ensuring reliability and long time stability of the gob-side entry retaining; by using the method, the gob-side entry retaining is scientific and reasonable, safe and reliable, easy to construct, and good in effect.

Description

technical field [0001] The invention relates to a multi-stage reinforcement method for gob-side entry retention in high-stress and strong-disturbance coal seams, and is especially suitable for reinforcement of gob-side entry entry retention in goafs when mining large mining depths, complex roofs, and short-distance high-gas coal seam groups. Background technique [0002] For the mining of high ground stress, thick hard roof, and direct overlying close-distance coal seam group, due to the wide "three zones" of the hard roof working face, the mining is strong, the roof pre-cracking is dangerous and difficult, and the side long overhang of the goaf causes high additional stress. , the filling wall bears a large load, is difficult to maintain, and a large number of pressure-relieving gas from adjacent layers pours into the goaf of the protective layer, threatening the safety of the protective layer. At present, there is no coal pillar-free goaf retention under such conditions in ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D20/00E21D11/10E21F15/04
CPCE21D11/10E21D20/00E21F15/04
Inventor 张建国林柏泉吕有厂杨威康国峰乔时和肖珷王玉杰陈召繁
Owner PINGDINGSHAN TIANAN COAL MINING
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More