A long and short pile foundation treatment structure and construction method in collapsible loess area
A technology for collapsible loess and foundation treatment, which is applied in infrastructure engineering, soil protection, construction, etc., and can solve problems such as increased construction time and inspection time, large amount of foundation reinforcement works, and long roadbed engineering lines, etc., to achieve shortening The effect of improving the construction period, saving engineering cost, and improving the bearing capacity of the foundation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0018] Such as figure 1 and figure 2 As shown, the first embodiment of the foundation treatment structure of the present invention includes a first water-proof curtain 1 and a second water-proof curtain 5 arranged side by side, and the side of the first water-proof curtain 1 facing the second water-proof curtain 5 and the roadbed 4 One slope toe of the subgrade is in the same vertical plane, the side of the second water-proof curtain 5 facing the second water-proof curtain 1 is in the same vertical plane as the other slope foot of the subgrade 4, the first water-proof curtain 1 and the second water-proof curtain The curtains 5 are all composed of four rows of compacted long piles 7, and the compacted long piles 7 in the water-proof curtain are arranged in a quincunx shape, that is, the three adjacent compacted long piles 7 are respectively lo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


