Method for producing exterior wall decoration wall plate from combustible refuse
A technology for exterior wall decoration and decorative panels, applied in the direction of climate sustainability, sustainable waste treatment, solid waste management, etc., can solve the problems of troublesome installation and disassembly, complicated manufacturing process, high manufacturing cost, etc. Good crack resistance and low production cost
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2016-04-20
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1
Abstract
Description
technical field
[0001] The invention relates to a method for producing exterior wall decorative wallboards by using combustible garbage. Background technique
[0002] Entering the 21st century, green and environmental protection have become the theme of the world. With the rapid development of my country's national economic construction, energy conservation, emission reduction, low-carbon and circular economy have become my country's major policies. The building materials industry is the industry that eats the largest amount of slag and garbage, and shoulders the heavy burden of circular economy.
[0003] In order to reduce construction costs and improve construction efficiency, the walls of buildings are all cast-in-place walls. That is to build the wall mold (also called plywood) first, then pour concrete into the mold to form the wall, then disassemble the mold to get the wall, and then paste the exterior wall board or paint the exterior wall on the wall, which is comple...
Examples
Embodiment 1
[0021] The production system of the present invention such as figure 1 As shown: the production system is composed of rubbing machine 1, belt conveyor 2, two relatively rotating rollers 3, cement spraying machine 4 and drying room 5. The structures of rubbing mill 1, belt conveyor 2, two relatively rotating rollers 3, cement spraying machine 4 and drying room 5 are all prior art, and will not be repeated here. The starting end of the belt conveyor 2 is located below the discharge port of the grinding machine 1, and the rear part of the conveying belt of the belt conveyor 2 passes through the gap between the two rollers 3, and the gap between the two rollers 3 It can be adjusted according to the thickness of the board required. The cement spraying machine 4 is located above the belt conveyor 2 in front of the two relatively rotating rollers 3, and then the belt conveyor 2 enters the drying room 5, where it is dried. Dry.
[0022] Burnable garbage refers to garbage that can be...