Construction method and system for improving secondary grouting quality used for shield construction
A technology of secondary grouting and construction method, which is applied in earth-moving drilling, wellbore lining, tunnel lining, etc., can solve the problems of easy blockage of grouting pipes and tee fittings, unstable sealing effect of secondary grouting, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0077] In a subway tunnel project constructed by shield tunneling method in Panyu District, Guangzhou City, Guangdong Province, the diameter of the tunnel is 6m, and a second grouting is required for a certain part of the tunnel. This embodiment provides a construction method for improving the quality of secondary grouting in shield tunneling construction. The specific construction steps of the construction method are as follows:
[0078] Step 1. Determine the geological conditions of the construction site:
[0079] Consult the geological survey report, and determine that the stratum around the grouting position is divided into 2 layers, the first layer is clay layer, and the effective gravity γ 1 20kN / m 3 , thickness h 1 The second layer is medium weathered granite, the surrounding rock grade is IV, and the thickness of the surrounding rock above the grouting position is h 2 5m, surrounding rock weight γ 2 25kN / m 3 , groundwater initial water table depth H w is 1m, grou...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com