A kind of high rubber asphalt and preparation method thereof
A technology of high rubber asphalt and asphalt, which is applied in the field of high rubber asphalt and its preparation, can solve the problems of high cost and unstable index, and achieve the effects of excellent thermal storage stability, easy control, and high viscosity and toughness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Step 1: In terms of mass fraction, add 6% of SBS411 (LG) to 94 parts of 70# heavy traffic asphalt, and use a colloid mill to shear at 170-190°C.
[0034] Step 2: Transfer the sheared modified asphalt to a high-speed disperser and stir for 150 minutes. The stirring speed is 800-900r / min. During the process, add a total of 0.15 parts of sulfur to prepare modified asphalt. The prepared modified asphalt is numbered 1, and its properties are shown in Table 1.
Embodiment 2
[0036] Step 1: In parts by mass, 50 parts of desulfurized colloidal particles and 50 parts of SBS are uniformly mixed.
[0037] Step 2: In parts by mass, 12 parts of the mixture are added to 88 parts of 70# asphalt, and sheared with a colloid mill at 170-190°C.
[0038] Step 3: Transfer the sheared modified asphalt to a high-speed disperser and stir for 120 minutes to develop at a stirring speed of 800-900r / min to prepare high-bonding asphalt. The prepared modified asphalt is numbered 2, and its properties are shown in Table 1.
Embodiment 3
[0040] Step 1: In terms of parts by mass, 50 parts of desulfurized rubber particles and 50 parts of SBS are mixed in a disc grinder for solid-phase mechanochemical reaction to prepare SBS / desulfurized rubber particle modified composites. The reaction temperature is normal temperature. The rotating speed is 900r / min, and the time is 20 seconds.
[0041] Step 2: In parts by mass, 12 parts of the mixture are added to 88 parts of 70# asphalt, and sheared with a colloid mill at 170-190°C.
[0042] Step 3: Transfer the sheared modified asphalt to a high-speed disperser and stir for 120 minutes to develop at a stirring speed of 800-900r / min to prepare high-bonding asphalt. The prepared modified asphalt is numbered 3, and its properties are shown in Table 1.
PUM
| Property | Measurement | Unit |
|---|---|---|
| size | aaaaa | aaaaa |
| softening point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 
