Index closed-loop control early warning platform
A technology of indicators and control, applied in the field of data management, can solve problems such as untimely reporting, time-consuming, and reporting delays, and achieve the effects of benefiting enterprise information security management, improving user experience, and diversifying functions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] The embodiment of the present invention provides an indicator closed-loop management and early warning platform, such as figure 1 shown, including:
[0043] A login terminal 11, the login terminal 11 presets one or more levels of login authority.
[0044] Wherein, the login terminal 11 is a user login port. The platform of the present invention can download and install a plurality of login terminals 11 according to the scope of use, that is, the number of users. Each login terminal 11 presets enterprise login authority, department login authority and personal login authority, so users Only by entering the login authority verification information at all levels, that is, the login password, can the platform of the present invention be entered, which effectively prevents the leakage of enterprise information, department information and personal information, and effectively guarantees the security of information within the enterprise.
[0045] What needs to be explained he...
Embodiment 2
[0067] The embodiment of the present invention provides an indicator closed-loop management and early warning platform, such as image 3 shown, including:
[0068] A login terminal 21, the login terminal 21 presets one or more levels of login authority.
[0069] The index entry module 22 is used to enter the target index and the corresponding completion index.
[0070] The data analysis module 23 calculates the completion rate of the completion index based on the target index: the completion rate=the completion index value÷the target index value×100%.
[0071] The display module 24 is configured to display the completion rate in a graphical form.
[0072] Early warning module 25, described early warning module 25 comprises calculation unit 251, contrast unit 252 and alarm unit 253; Described calculation unit 251 is used for calculating difference rate; Described difference rate=100%-described completion rate; Described comparison unit 252 is used to compare the difference r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com